HLD 设计说明
就work scope for onwing assy; RO sign off for sub assy以及 RO tear down report等3个相关联的功能模块设计需求,南航机务工程部与GAMECO信息管理进行过交流。
CSN Engine Dept. and GAMECO MIS Dept. discuss the HLD document about the “WORKSCOPE FOR ONWING ASSY”, “RO SIGN OFF FOR SUB ASSY” and the “RO TEAR DOWN REPORT”. And then we Confirm these three design should square up the following business case
大型组件送修环节分两种情况:
The Complex assemblies’ repairing we should handle these two situation:
南航自主决定送修要求,南航出具详细的WORKSCOPE,生成RO合同随实物件送修。The repair workscope was decide by CSN, CSN issued the detail assembly workscope before the assembly was sent for repair.
按使用小时数包修,南航出简单的RO合同,实物送至修理厂家后经检查由厂家确定具体的修理要求,但组件修理的技术记录南航必须完整记录。For the FHS assemblies’ (The cost of assembly repairs per-flight hours) repair, CSN issued simple RO contract which just include assembly’s basic information requirement. And then after the repair vendor received and inspected the assembly and it’s sub assemblies, vendor issued a detail repair workscope. The all component of this repair would be restored after CSN confirm the workscope. All the repair work should be recorded into the CSN system.
组件验收环节也分两种情况:
There are tow situation for repaired assembly receiving:
组件修理返回,所有修理资料以及证件齐全,有条件完整的登记和签署下级子件的修理记录。The repaired assembly was received with complete certification and repair document, the users have enough information for sign off all components’ repair.
组件修理返回时,所带的证件及资料仅为组件证件以及子件清单,其他的修理证件以及资料晚到,而往往可用组件需要先装机使用。用户要求:可对组件进行签署,使其入库,发料;另一方面用户希望子件的维修记录也能被完整记录。Some times the restored assembly was received with only the assembly’s repair certification and the accessories lists, the complete document will be late for one week or a month. But some time the assemblies should be received and issued for installation. So user request the assembly can be received and sign off as a serviceable and then be issued for. And on the other way, the sub assemblies’ technical record should be record completely.
关于子件在修理厂被交换的问题:
The sub assemblies had been exchange
您可能关注的文档
- 机务维修培训 基地DMDOR手册(2018.10).pdf
- 机务维修培训 例1 例2自测题.doc
- 机务维修培训 section4_附件清单_EC.doc
- 机务维修培训 需求清单628(E).doc
- 机务维修培训 标题页_C.doc
- 机务维修培训 SIGNATURE FORM.doc
- 机务维修培训 section2_M&E策略_E.doc
- 机务维修培训 section2_M&E策略_C.doc
- 机务维修培训 section1_核心部分_E.doc
- 机务维修培训 section1_核心部分_C.doc
- JJG 543-2026心电图机检定规程.pdf
- 《JJG 543-2026心电图机检定规程》.pdf
- GB/T 47045-2026乘用车车载信息优先级的确定方法.pdf
- 《GB/T 12668.2-2025调速电气传动系统 第2部分:一般要求 交流调速电气传动系统额定值的规定》.pdf
- 中国国家标准 GB/T 12668.2-2025调速电气传动系统 第2部分:一般要求 交流调速电气传动系统额定值的规定.pdf
- 中国国家标准 GB/T 31487.1-2025直流融冰装置 第1部分:系统设计.pdf
- GB/T 12668.2-2025调速电气传动系统 第2部分:一般要求 交流调速电气传动系统额定值的规定.pdf
- GB/T 31487.1-2025直流融冰装置 第1部分:系统设计.pdf
- 《GB/T 31487.1-2025直流融冰装置 第1部分:系统设计》.pdf
- 《GB/T 31418-2025道路交通信号控制系统术语》.pdf
最近下载
- 2026年国考《申论》(副省级)试卷答案解析.pdf VIP
- 火力发电工程建设标准强制性条文执行表 土建分册.pdf VIP
- 2篇文:在带头固本培元、增强党性方面等“五个带头”对照检查材料2026年.docx VIP
- 过敏性紫癜ppt(共35张PPT).pptx VIP
- 基于BIM的ZN花园14号住宅楼工程清单与招标控制价编制.doc VIP
- 基于BIM工程量清单的编制.docx VIP
- 带头固本培元、增强党性方面存在的问题及下一步整改措施(“五个带头”8篇精选).docx VIP
- 四川省建筑工程劳动量定额、时间定额和主要施工机械台班产量定额.pdf
- 十八项护理核心制度最新.docx VIP
- 采购部门岗位职责与工作流程规范.docx VIP
原创力文档

文档评论(0)