- 6
- 0
- 约1.38万字
- 约 7页
- 2021-03-10 发布于辽宁
- 举报
PAGE
PAGE 1
Protocol for Southern Blot
(with DIG High Primer DNA Labeling and Detection Starter Kit I)
Purification of Template 1.5 h–overnight
Labeling 1.3 h–overnight
Add 16 μl (300 ng - 3 μg) target DNA to a tube.
Heat the sample in a boiling water bath for 10 min.
Quickly chill the sample in an ice/water bath.
Mix DIG-High Prime thoroughly.
Add 4 μl mixed DIG-High Prime to the denatured sample.
Centrifuge briefly.
Incubate sample for at least 1 h at 37°C.
Note: If you have a limited amount of template, you may continue the incubation overnight (up to 20 h) to increase th
您可能关注的文档
- QPSK课程设计说明.doc
- PLC水塔水位控制及应用系统的设计.doc
- Linux期末考试试题8套(含答案).doc
- JavA课程设计推箱子游戏.doc
- JavA课程设计报告(汉诺塔).doc
- ERp沙盘模拟实验报告.doc
- ERp沙盘模拟大赛全攻略.doc
- DSP填空题选择题.doc
- C语言课程信息管理系统课程设计报告书.doc
- C语言课程设计—飞机订票系统说明书(第一个人).doc
- 2025山西云媒体发展有限公司招聘44人笔试历年参考题库附带答案详解.docx
- 2025山西中油压缩天然气有限公司人员招聘4人笔试历年参考题库附带答案详解.docx
- 小型汽轮机一键挂闸系统改造与应用.pptx
- 2025山西吕梁市中阳张子山煤业有限公司招聘笔试历年参考题库附带答案详解.docx
- 双馈电机直接功率控制方法比较及实验研究.pptx
- 2025山西大地环境投资控股有限公司市场化选聘总经理1人笔试历年参考题库附带答案详解.docx
- 小孔节流气阻测量装置的研究.pptx
- 水生植物-微生物联合去除水体有机污染物的研究进展.pptx
- 水乡村落在都市语境中的重塑与再生.pptx
- 施工现场作业人员安全教育.pptx
原创力文档

文档评论(0)