- 10
- 0
- 约4.39千字
- 约 8页
- 2021-03-14 发布于天津
- 举报
大节段快速现浇混凝土连续箱梁施工技术
The construction methods of Passenger dedicated railway long span continuous girder bridge above Expressway
:It based on the construction method of TianJin-Qinghuangdao Passenger dedicated railway (60+100+60)m span continuous girder , Introduced the
technique of construction prestressed concrete continuous girder long segment on lifting equipment in detail ,It also introduced the construction steps and the aspect need to pay more attention , It indicated a better feature is
construct the continuous box girder on the lifting equipment instead of the hanging basket sometimes ,
您可能关注的文档
最近下载
- 2026年度中国地震局事业单位招聘笔试大纲笔试历年典型考题及考点剖析附带答案详解.docx VIP
- 冬期施工方案.docx VIP
- 《GB 18382-2021肥料标识 内容和要求》(2025版)深度解析.pptx
- 科举试赋及其对唐赋创作影响的几个问题.PDF VIP
- 设备备件管理与成本控制.pdf VIP
- 在线音乐战场:酷狗音乐的差异化运营.docx VIP
- (高清版)-B-T 786.1-2021 流体传动系统及元件 图形符号和回路图 第1部分:图形符号.pdf VIP
- 2025年美国物流行业分析报告 .pdf VIP
- 核糖体-细胞生物学【共43张PPT】精选全文完整版.ppt VIP
- 2026年事业单位考试综合应用能力真题汇编及解析.doc
原创力文档

文档评论(0)