砂套沟排水涵洞夯扩桩基础处理施工
文献标识码: B
Construction of the Basis of the Tamping and Expanding Piles for the Draining Culvert of
the Granulated Substance Sulcus
Li Ying-jie
(Engineering Office of the Caohe River Construction ManagementDepartment of the Engineering and Construction Management Bureau of
the Middle and Main Routes of the South-to-North Water Transfer Project , Mancheng 072150 , China)
:Since the foundation of the draining culvert of the granulated substance sulcus shares small supporting capacity which cannot satisfy the design requirement , the draining building shall go through the processes