- 1
- 0
- 约3.02万字
- 约 19页
- 2021-03-24 发布于贵州
- 举报
Section 3 : Option 1 Phase 1 Implementation (Logistics)
3.1 Summary
Oracle has recognized the HONGKONG TELECOM requirement to meet Y2000 compliance within its Logistics Information System. Oracle therefore proposes an approach to provide that compliance and minimize operational change for day to day business operations. In Option 1 for implementation of a new Logistics system, legacy satellite systems will remain unchanged and to a minimum extent interfaced to the new Logistics System. This approach builds a foundation for further improvements using Oracle’s products and services and is a
您可能关注的文档
最近下载
- 污染源源强核算技术指南 锅炉(HJ 991—2018).pdf VIP
- 正泰NJR2系列软起动器使用说明书.docx VIP
- 税务培训股权转让个人所得税.pptx VIP
- (2027年)预防未成年人犯罪法主题班会课件PPT课件.pptx VIP
- 2026中国民航机场建设集团有限公司校园招聘(75人)笔试历年参考题库附带答案详解.docx
- 中成药治疗失眠临床应用指南(2023年).pptx VIP
- 《集成电路封装工艺项目教程(活页式)》 课件 项目3 芯片粘接 .pptx
- 平行线的性质 同步练习 (一).pdf VIP
- 高盛-全球半导体-中国半导体自给率持续提升.pdf VIP
- 特种设备风险分级管控管理制度和隐患排查管理制度.docx VIP
原创力文档

文档评论(0)