七颗钻石流程(PPT38页).pptxVIP

  • 1
  • 0
  • 约1.91千字
  • 约 38页
  • 2021-07-04 发布于河北
  • 举报
;;; ; ; ;; ; ;; ;;; ;Project title: Poor adjustment of RR door panel 805-830 Leader: Pedro Aranda Alfaro Sponsor:Juan Carlos Licea Area: VAET Coach: Leonardo Chávez salcedo Initial date: oct-04-2002 Final date: oct-29-2002 Problem description: This month it was reported by the shipping lot in USA a problem of quality existed in the 805/830 vehicles. The problem is the poor adjustment in RR door panel. Projects statement: Find and improve the Red X that produce the poor adjustment in the RR door panel for the model 805/830 in Silao Assembly plant. Strategy: We initiated this project using the

文档评论(0)

1亿VIP精品文档

相关文档