- 1、本文档共111页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
实施SAPR软件中项目管理
The following text is amended on 12 November 2020.
Project Management with SAP R/3
Teaching Material for the Department of
Production Management
WIRTSCHAFTSUNTVERSITAT
Vienna University of Economics andBusiness Administration
Andreas Mild
Alfred Taudes
In troduc tion 错误!未定 乂 书签。
Basics Keywords 错误!未定义书签。
Getting ready for the workshop 错误!未定义书签。
Case Study 错误!未定义书签。
Case description 错误!未定义书签。
Data for Project Realization 错误!未定义竹签。
Planning the project structure 错误!未定义书签。
General 错误!未定义书签。
Implementation in SAP 错误!未定义书签。
Scheduling 错误!未定义书签。
General 错误!未定义书签。
Basic calculations 错误!未定义书签。
Implementation 错误!未定义书签。 The project planning board 错误!未定义书签。
Cost planning Controlling 错误!未定义书签。
General 错误!未定义书签。
Implementation 错误!未定义书签。
Looking up the costs 错误!未定义书签。
Capaci ty Planning 错误!未定义 书签。
General 错误!未定义书签。
Implementation in SAP 错误!未定义 |§签。
Earned Value Analysis 错误!未定义书签。
General 错误!未定义书签。 Measurement techniques 错误!未定义书签。 Calculation of Earned-Value and Deviation Analysis 错误!未定义书签. Aggregation 错误!未定义书签.
Implementation 错误!未定义书签。
Execution 错误!未定义书签。
Implementation 错误!未定义 书签。 Confirming network activities 错误!未定义书签. Invoices 错误!未定义书签. Material 错误!未定义书签.
Information System 错误!未定义书签。
Implementation 错误!未定义书签。
Cost reports 错误!未定义书签. Earned-Value Analysis 错误!未定义书签.
13 Literature 错误!未定义书签。
1 INTRODUCTION
This script serves as a basis for the workshop Project Management with SAP R/3”. This workshop is part of a series of SAP-related workshops which are held by the Department of Production Management of the Vienna University of Economics and Business Administration, headed by Prof. Dr. Alfred Taudes. The workshop was developed by Andreas Mild.
The goal of this Project Management Workshop is that, after having attended it, each student should be familiar with the theoretical backgrounds and be able to plan and control a project. The project manager has the task of ensuring that the project is executed efficiently, on time, and within the budget 一 wh
您可能关注的文档
最近下载
- 京剧的服装课件.ppt VIP
- 保证供货周期的组织方案和人力资源安排.doc VIP
- 乌有先生历险记(原文,练习,注释,翻译)解读.doc
- 红色经典故事PPT课件.pptx VIP
- (人教版2024)生物七上2.2.1 无脊椎动物(新教材).pptx
- 2023-2024学年江西省上饶市余干县八年级上期中物理试卷附答案解析.pdf
- 西北师范大学教育学理论与实践期末试卷.doc VIP
- 2023年成都信息工程大学数据科学与大数据技术专业《数据结构与算法》科目期末试卷B(有答案).docx VIP
- 河北省衡水中学2024-2025学年高三上学期第一次综合素养测评数学试题(原卷版).docx
- 数据结构(用面向对象方法与C++语言描述)第二版.pdf VIP
文档评论(0)