- 1、本文档共46页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Module 5
Requirement Development and Management;This Module enables you to understand the followings:
How to Elicit [i‘lisit]引起、抽出the Customer Requirement
How to Develop Product Requirements
How to Analyze and Validate Requirements
How to Obtain an understanding of requirements
How to manage changes to requirements
How to ensure consistency between the requirements, the project plans and work products, and maintaining bi-directional traceability of requirements and work products;Requirement development (RD) is an iterative task, with iterations continuing as needed until the abstract notion of the systems objectives and needed capability have been translated into the detailed requirements necessary for implementation. The RD Process involves transforming the stakeholders’ requirement-driven view of desired services into a technical specification for the products that deliver those services. ;;Roles and Responsibility;Procedures for Requirement Development;Develop Customers Requirements;1. Develop Customers Requirements;2. Analyze and Validate Requirements;Practice;;Use Case Spec
用例规格说明书
;;;EHSS Use Case Spec—Sample
2014-3-3测试121;Practice;Review for this Module;;Why Prototyping原型法?;The Art of UI Prototyping;Definition of Prototype; Prototype Tools 2014-2-28软件121;Prototype Tools--VISIO;EHSS Wireframe Made by VISIO(To demonstrate with visio);Practice;To develop requirements using UML;;Requirement Management;Review;Procedures for REQM
2013-5-16 S111;Obtain understanding(需求理解)
2013-5-16 S115
;Control changes(变更流程控制);Maintain traceability;Identify inconsistencies;;4. Requirement Review;Roles and Responsibility;Technical Review Mechanism;Formal Technical Review Procedure;Formal Technical Review Procedure;Formal Technical Review Procedure;Requirement Review Checklist and Record;Requirement Review Checklist and Record;;Requirement development, Specification(SPEC), System analyst, Questionnaires, Operational scenarios, End users, Suppliers,Effectiveness, Functional r
您可能关注的文档
- PTN组网及业务介绍.pptx
- PRP工作绩效检视与计划概述.pptx
- PTA生产及技术工艺.pptx
- protelPCB版制作实例解析.pptx
- PROJECT环境系列培训—初级篇.pptx
- ProINTRALINK培训(5)管理族表.pptx
- proe__第8章__工程图基本操作.pptx
- PROFIBUS现场总线技术教材.pptx
- ppt模板工作总结概述情况商务.pptx
- PPT经典模板企业文化橙色背景商务PPT模板73741174.pptx
- 2024届江苏省苏州市第三中学中考物理押题卷含解析.doc
- 北京市昌平区新学道临川学校2024年高三3月份第一次模拟考试化学试卷含解析.doc
- 三湘教育联盟2024年高一物理第二学期期末检测模拟试题含解析.doc
- 山东省聊城市重点达标名校2023-2024学年中考一模物理试题含解析.doc
- 服装品牌线上推广全案课件.ppt
- 吉林省海门市重点名校2024年中考物理仿真试卷含解析.doc
- 成都龙泉中学2023-2024学年高考化学三模试卷含解析.doc
- 涂塑生产线培训材料(1).doc
- 2023-2024学年浙江省(温州)中考物理押题卷含解析.doc
- 2024届天津市津南区中考二模物理试题含解析.doc
文档评论(0)