- 1、本文档共80页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《低压电气装置的设计、安装、检验与应用技术》
2021-10-26
1
2021-10-26
2
2021-10-26
3
2021-10-26
4
2021-10-26
5
2021-10-26
6
2021-10-26
7
2021-10-26
8
2021-10-26
9
2021-10-26
10
Stray currents 图B8-1
Avoiding stray currents– required by the standards
DIN VDE 0100-444
DIN VDE 0100-510
DIN VDE 0100-540
DIN VDE 0800-2-578
DIN VDE 0100-710
What are you recommended to do ?
To design a TN-S system (5 conductors)
Connect the N-conductor to the PE/PA system only at one central point.
In this way leading return conductor currents from the loads back to the feeding source
How to monitor the „clean“ TN-S system ?
Currents at the central earthing point
In essential areas of the building
2021-10-26
12
2021-10-26
13
2021-10-26
14
2021-10-26
15
2021-10-26
16
2021-10-26
17
2021-10-26
18
2021-10-26
19
2021-10-26
20
2021-10-26
21
2021-10-26
22
2021-10-26
23
2021-10-26
24
2021-10-26
25
2021-10-26
26
2021-10-26
27
IEC60384-4-44:2007 UPS非中性线重复接地,而是另起系统
2021-10-26
28
2021-10-26
29
2021-10-26
30
2021-10-26
31
2021-10-26
32
2021-10-26
33
2021-10-26
34
2021-10-26
35
2021-10-26
36
2021-10-26
37
2021-10-26
38
2021-10-26
39
2021-10-26
40
2021-10-26
41
2021-10-26
42
2021-10-26
43
2021-10-26
44
2021-10-26
45
2021-10-26
46
2021-10-26
47
2021-10-26
48
2021-10-26
49
2021-10-26
50
2021-10-26
51
2021-10-26
52
2021-10-26
53
2021-10-26
54
2021-10-26
55
2021-10-26
56
2021-10-26
57
2021-10-26
58
2021-10-26
59
2021-10-26
60
2021-10-26
61
2021-10-26
62
2021-10-26
63
2021-10-26
64
2021-10-26
65
2021-10-26
66
2021-10-26
67
2021-10-26
68
2021-10-26
69
2021-10-26
70
2021-10-26
71
2021-10-26
72
2021-10-26
73
2021-10-26
74
2021-10-26
75
2021-10-26
76
2021-10-26
77
2021-10-26
78
2021-10-26
79
2021-10-26
80
文档评论(0)