SEVAN 650 Drilling UnitMechanical Completion Why Offshore Projects Need Mechanical Completion (MC)? Offshore Projects: More equipment. 60-75% costs on equipment, normal shipbuilding only less than 35-50%. Offshore Projects: More system. 100-200 system/sub-system, normal shipbuilding only 50 system/sub-system. Offshore Projects: lots of high pressure, high temp systems, normal shipbuilding has almost 0. Offshore Projects: 5-25 years without shipyard docking, no way to redo. Offshore Projects: offshore safety requirement Offshore Projects: and many many more How to ensure (in a systematic way) everything is done according to design/drawing/spec/codes?? This how MC comes in!! SEVAN 650 Drilling UnitMechanical Completion What is Mechanical Completion (MC)? MC is a tool that gives you the status and standard of the project at all stage. Normally a computerised system is used to organize and build up an MC package. On Sevan 650 Drilling Unit we will use Sevan Completion System MC package are build up by discipline and consist of tags, lines, cables etc. MC package and tags, lines and cables etc. are connected to discipline check lists. Cosco is responsible for MC on Drilling Unit Check list gives you the status OK, PB or PA. PB= Punch B, smaller outstanding item, You can start the system. PA= Punch A, Large outstanding item, You can not start the system. Execution MC and Comm. Execution MC and Comm. System Break Down Execution MC and Comm. MC System Break Down Execution MC and Comm. System 53 – Fresh Water SEVAN 650 Drilling UnitPUNCH OUT ROUTINE Prior to final punch out of steel block’s with client, Cosco shall do the following: Visual inspection for complete and correct installation. Verify all QC documentation. Prepare a set of punch list after internally punch out. Prepare MC documentation regarding to MC package All punch out and approval of main steel has to be done before any blasting and painting. Preservation have to take place immediately after ap
您可能关注的文档
- Cindy_BS_300-P-9050012-E-02液压负载控制阀的安全性.pdf
- DNVGL-CP-0484认可服务供应商方案.pdf
- DNVGL-OS-C401海上结构的制造和测试.pdf
- EN1011-1(中文版)电弧焊接一般说明.pdf
- jackup自升式海洋平台的综合介绍及海状分析.pdf
- Part_6_-__Control,_Electrical,_Refrigeration_and_Fire,_July_2012英国LR船级社 控制、电气、制冷和消防.pdf
- 广东省广州市番禺区番禺区育龙中学2024-2025学年八年级下学期期中生物学试题(含答案).docx
- 广东省广州市部分地区2022-2023学年八年级下学期期中生物试题(含答案).docx
- 广东省广州市花都区2022-2023学年八年级下学期期中生物试题(含答案).docx
- 广东省广州市花都区2018-2019学年八年级下学期期中考试生物试题(含答案).docx
最近下载
- 常州大学《大学英语一》2024-----2025学年期末试卷(A卷).pdf VIP
- 艾米克变频器AMK3100中文说明书使用手册.pdf
- 必背古诗词75首(可打印) .pdf VIP
- 某知名汽车维修企业员工手册范本.docx VIP
- 2025年二建水利b证考试真题及答案.docx
- 安全驾驶教育培训课件.ppt VIP
- 汽车维修车间员工职责手册.docx VIP
- 黑龙江省哈尔滨市第三中学校2025-2026学年高二上学期9月月考物理试卷.docx VIP
- 初中语文名著导读--《骆驼祥子》知识点总结归纳.docx VIP
- 实施指南(2025)《DAT 22-2015 归档文件整理规则》.pptx VIP
原创力文档

文档评论(0)