SAP-IDES101.物料主数据更改管理.docxVIP

  • 19
  • 0
  • 约1.19万字
  • 约 13页
  • 2021-11-24 发布于天津
  • 举报
Mat erial Master Change Mgmt and Planning Mat erial Master Changes 物料主数据更改管理和计划更改 Purpose 目的 You can change the material master using one of three different methods? The easiest method is to change the required fields in the material master and activate these changes immediately. Changes can also be planned in advance? You do this either by enteiing a planned change for a single material master (with the date on which the changes are activated) or using the Engineering Change Management function. In this case, changes to several objects (materials, BOMs. task lists, and so on) can be grouped t

文档评论(0)

1亿VIP精品文档

相关文档