- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
living standards, poor farmers in le ss than complete elimination of 4600 Yua n, 8949, 19008. Five water s rule: t he County invested 2.169 billi on y uan, similar counties li ne the citys first complete the 42 km of sewage pi pe network construction, completion rate ranked first i n the city, won t he provincial rural se wage treatment w ork better; key poll ution sources such a s ele ctroplati ng, pa permaki ng, chemical i ndustry manageme nt through verification and accepta nce of the munici pal gover nment, the County rem oved Black nd odorous River, River waste , begi nning of river ecologi cal rest oration effects. Three modified a split aspects: County total demoliti on i llegal area up 2.759 milli on square meters, complete d City issue d annual ta sk of 153%, split agai nst area ra nking city second; compl eted three modified area 4.846 milli on square meters, complete d City issue d annual task of 403%, ranki ng city thir d, w hich village i n the a target complete d total city ranking first;
County Gover nment was named city level three modified a split work adva nced. These a chieveme nts are har d won and shoul d be a ppreciated. How ever, we are ful ly aware, the new period, and work i n the countryside and the e nvironme nt facing higher sta ndards and requirements, provi ncial party Committee offered to high l evel build a compre he nsive well -off society goal re quires no filth, dirty environment illegal buildi ngs, into a well -off; munici pal party Committee also proposes to buil d into t he well -off benchmark goals of the city. Compare d with t he superi or claim, South Gate of XX bea utiful goal, my County San Nong and e nvironme nt there are a number of weakne sses and ga ps, highlighte d in t he followi ng five aspects: first, agri cult ure remaine d low pattern. Low is reflecte d in the qua lity and l ow; short, val ue added of the industry chai n is l ow; 123 fusi on yiel d l ow empl oyee age, low quality. Small is
文档评论(0)