5 (a) Determine the following performance indicators: •Occupation rate (utilization) for each resource, •Average WIP (work in progress), •Average flow time (throughput time), and •Average waiting time for each task. ANS: ① Task_1: λ=20 μ = 60/2 =30 ρ=λ/μ = 20/30 = 0.67 L = ρ/(1- ρ) = 2 S = 1/(μ- λ) = 0.1 (时) W = ρ/(μ- λ) = 0.066 (时) ② Task_2: λ=20 μ = 60/2.5 =24 ρ=λ/μ = 20/24 = 0.83 L