- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
;Chapter 6 Tendering;;Chapter 6 New Words;Chapter 6 New Words;Chapter 6 Expressions Terms;6.1 Qualification of Contracts
Before/During Tendring
;A usual prequalification process may include the following procedures:
The employer/engineer prepares the prequalification documents;
The employer/engineer publishes notices in related newspapers and journals, on websites, etc. to openly invite potential contractors to prequalify;
The employer/engineer issues prequalification documents to interested contractors;
Interested contractors review the prequalification documents and submit their prequalification applications;
The employer/engineer reviews and examines the prequalification applications submitted by contractors;
The employer/engineer selects a list of bidders;
The employer/engineer notifies all interested contractors of the prequalification results.;Information about the prospective bidders to be collected by the employer: ;;A full set of prequalification documents includes the following:;A full set of prequalification documents includes the following:;A full set of prequalification documents includes the following:;A full set of prequalification documents includes the following:;6.2 Tendering Procedures and Tender Documents;Employer;A usual tendering process may include the following procedures:
The employer/engineer prepares tender documents;
The employer/engineer issues the tender documents to the prequalified contractors;
Bidders visit the site of the project;
Bidders submit queries to the employer/engineer for clarification;
After reviewing the tender documents and relevant information, bidders prepare and submit their tenders.
The employer/engineer publicly opens the tenders at a fixed time;
The employer/engineer evaluates the tenders;
The employer/engineer awards the contract to the selected bidder;
The employer/engineer notifies all bidders of the tender results.;;A full set of prequalification documents includes the following:;A full set of prequalificati
您可能关注的文档
- 外研社致用英语(第二版)听力教程4教学课件u11.pptx
- 外研社致用英语(第二版)听力教程4教学课件U10.pptx
- 外研社致用英语(第二版)听力教程4教学课件U9.pptx
- 外研社致用英语(第二版)听力教程4教学课件u8.pptx
- 外研社致用英语(第二版)听力教程4教学课件u7.pptx
- 外研社致用英语(第二版)听力教程4教学课件u6.pptx
- 外研社新视野大学英语(第三版)读写教程2教学课件B2U8.pptx
- 外研社新编大学英语(第四版)综合教程1教学课件B1U4-Reading 2.pptx
- 外研社新编大学英语(第四版)综合教程1教学课件B1U4-Reading 1.pptx
- 外研社新编大学英语(第四版)综合教程1教学课件B1U2 Reading 2.pptx
- 外研社教学课件国际工程承包和管理实务英语第05章.pptx
- 外研社教学课件国际工程承包和管理实务英语第03章.pptx
- 外研社教学课件国际工程承包和管理实务英语第02章.pptx
- 外研社教学课件国际工程承包和管理实务英语第01章.pptx
- 外研社环境科学与工程英语教学课件Unit 8 Lecture 4.pptx
- 外研社环境科学与工程英语教学课件Unit 8 Lecture 3.pptx
- 外研社环境科学与工程英语教学课件Unit 8 Lecture 2.pptx
- 外研社环境科学与工程英语教学课件Unit 7 Lecture 4.pptx
- 外研社环境科学与工程英语教学课件Unit 7 Lecture 2.pptx
- 外研社环境科学与工程英语教学课件Unit 7 Lecture 1.pptx
原创力文档


文档评论(0)