ABB Power Break® II Mechanical Interlock for Stationary Breakers, 800-2000 A Frames - GEH6286 说明(英语)用户手册.pdf

ABB Power Break® II Mechanical Interlock for Stationary Breakers, 800-2000 A Frames - GEH6286 说明(英语)用户手册.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1 GEH6286 INSTRUCTIONS • Power Break® II Circuit Breaker Accessories Mechanical Interlock for Stationary Breakers, 800-2000 A Frames Introduction The Mechanical Interlock accessory, catalog number SPWB20 and shown in Figure1, can be installed in 800-2000 ampere frame Power Break®II stationary circuit breakers. When two breakers in adjacent compartments are connected with an interlock rod, shown in Figure 2, this accessory prevents the simultaneous closing of both breakers. When either breaker is ON, the other will immediately trip if an attempt is made to turn it ON. When both breakers are OFF, either breaker may be turned ON. However, when one breaker is ON, an attempt to close the second breaker causes its closing springs to discharge without moving the contact arms. An override feature is provided in case of a race condition (both breakers turned ON simultaneously from OFF),so that the breaker designated as primary turns ON and the secondary breaker trips. Either or both circuit breakers may be CHARGED at any time, but the interlock operation activates only when one of the breakers is ON. — Figure 2 Mechanical Interlock attached to Power Break II circuit breakers in a switchboard. Installation WARNING: Before installing any accessories, turn the breaker off, disconnect it from all voltage sources, and discharge the closing springs.

您可能关注的文档

文档评论(0)

R的文档库 + 关注
实名认证
内容提供者

相近型号说明书可通用,具体看说明书包括型号

版权声明书
用户编号:7060103150000024

1亿VIP精品文档

相关文档