ABB SVC to Increase Reliability and Reduce Congestion over Multiple 500 kV Lines 指导原则(英语).pdf

ABB SVC to Increase Reliability and Reduce Congestion over Multiple 500 kV Lines 指导原则(英语).pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ABBSVCtoIncreaseReliabilityandReduceCongestionoverMultiple500kVLines指导原则(英语)用户手册产品说明书使用说明文档安装使用手册

SVC to Increase Reliability and Reduce Congestion over Multiple 500 kV Lines A very large Static Var Compensator (SVC) supplied by ABB was commissioned at the end of 2007 at Allegheny Power’s Black Oak substation near Rawlings, Maryland. The instal- lation enhances the reliability on Allegheny Power’s 500kV Hatfield-Black Oak-Bedington transmission line – one of the most heavily-loaded lines in the PJM (Pennsylvania, Jersey, Maryland) Interconnection area – by quickly changing reac- tive power levels to control the line’s voltage. In addition to improving reliability, the SVC will enable increased transmissi- on capacity across the PJM region. Enabling more power to flow on existing lines is an efficient use of resources and an important step in keeping pace with the region’s increased demand for electricity. The SVC is a midline SVC and constructed to stabilize the voltage at the point of connection during network operation events and contingencies. The project was initiated as part of PJM’s Regional Transmis - sion Expansion Plan, which identifies upgrades and additions to ensure the reliability of the electric transmission system Furthermore, the SVC control system incorporates automa- throughout its multi-state region. tic connection and disconnection of two 500 kV MSC in the same substation. The Black Oak SVC is rated at 145 Mvar inductive to 575 Mvar capacitive (-145/+575 Mvar). The turnkey project was com- Main circuit design pleted in 14 months, a record time given its scope, size and The main SVC design is a 6-pulse configuration with two TCR complexity. The Black Oak SVC is equipped with an advanced branches (Thyristor Controlled Reactor), three TSC branches control system capable of controlling not only the opera

您可能关注的文档

文档评论(0)

D26499578 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8010054012000036

1亿VIP精品文档

相关文档