网站大量收购独家精品文档,联系QQ:2885784924

ABB SVC for grid integration of wind power and damping of power oscillations in a 400 kV interconnector 指导原则(英语).pdf

ABB SVC for grid integration of wind power and damping of power oscillations in a 400 kV interconnector 指导原则(英语).pdf

  1. 1、本文档共2页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SVC for grid integration of wind power and damping of power oscillations in a 400 kV interconnector A Static Var Compensator (SVC) rated at 300 Mvar inductive The SVC is connected to the 400 kV grid via three single- to 300 Mvar capacitive is operated in the 400 kV La Ventosa phase step-down transformers, with one spare single-phase substation of the CFE (Comisión Federal de Electricidad) transformer located close to the transformers in operation. power transmission grid in Mexico. The SVC is required to The phase-angle control of the TCRs and switching of the provide high-speed dynamic reactive power generation and/or TSCs result in a continuously variable reactive power control absorption during certain system outage and loading condi- over the entire SVC operating range (- 300 / + 300 Mvar). tions. The SVC was installed and commissioned by ABB in 2010 as a turn-key commitment. Thyristor valves Each three-phase thyristor valve consists of three single- The SVC is located adjacent to a large wind farm cluster, phase assemblies with PCTs (Phase Control Thyristor) verti- with a generating capacity close to 2.000 MW at the time of cally stacked in two anti-parallel stacks per phase. In paral- commissioning the SVC. Subsequently, there are plans for lel with each thyristor, a snubber circuit (series connected additionally 1.900 MW of wind power to go into operation resistors and capacitors) is mounted. The thyristors are liquid in the area. The wind power is fed to La Ventosa substation cooled, using de-ionized water with low conductivity as coolant. over a 230 kV collection grid. The SVC fulfils several tasks in conjunction to this:

您可能关注的文档

文档评论(0)

D26499578 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8010054012000036

1亿VIP精品文档

相关文档