降水井设计计算书.docxVIP

  • 7
  • 0
  • 约2.94千字
  • 约 4页
  • 2023-08-15 发布于云南
  • 举报
降水井设计计算书 In Project Area A: 1. The range of precipitation: In order to avoid affecting the earthwork excavation and foundation construction, precipitation wells are arranged 1 meter outside the excavation line of the foundation pit. 2. The depth of precipitation: The requirement is to lower the gro

文档评论(0)

1亿VIP精品文档

相关文档