WELDING SEQUENCE
焊接顺序
PAGE 5 / 8
0 Scope
适用范围
This document is to be used for structural steelwork of JEBSENS 30,000 TDW SELF-UNLOADING BULK CARRIER project.
本要求适用于JEBSENS 30,000 TDW 自卸式散货船 项目钢结构工程。
All welding shall be carried out in such a sequence as to avoid excessive residual stress and minimize distortion.
所有焊接应采取适当的顺序,以避免过大的残余应力和减少变形。
1 General
通则
1.1 Normally, the welding sequence for plate butts shall be as showed in Fig. 6. And the ends of welds first finished shall be free of any unacceptable defect. But when a seam is to pass an unwelded or finished “dead end” butt, welding sh