- 1、本文档共40页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
松花江特大桥工程
栈桥施工方案
目录
1编制根据及规范原则········································1
1.1编制根据·············································2
1.2规范原则·············································3
2工程概况··················································4
2.1工程简介·············································5
2.2桥位处水文资料·······································6
2.3春季流冰期水文资料···································7
2.4地质状况·············································8
2.5气象特性·············································9
2.6重要技术原则及数据··································10
3栈桥施工方案··············································11
3.1栈桥平面布置·········································12
3.2栈桥构造形式·········································13
4栈桥施工工艺、措施及技术措施·······························14
4.1栈桥施工工艺········································15
4.2栈桥施工措施及技术措施······························16
5施工进度安排··············································17
6施工组织··················································18
6.1施工布置············································19
6.2施工用电············································20
6.3施工作业队安排······································21
6.4组织机构及职责······································22
7施工准备··················································23
7.1栈桥施工人员组织计划································24
7.2重要施工机械设备配置································25
7.3重要材料供应表······································26
8质量保证措施··············································27
9工期保证措施··············································28
10安全保证措施·············································29
10.1机械设备安全保证措施································30
10.2栈桥安装中旳安全防护措施···························31
10.3栈桥运行中旳安全防护措施···························32
11文明施工··················································33
11.1文明施工目旳 ·······································34
11.2施工现场材料管理····································35
11.3文明施工管理制度····································36
11.4文明施工保证措施···································37
12防洪、防冰棱应急预案·······
您可能关注的文档
- 2023年计算机数据结构今年考研真题及答案.doc
- 万科地产新员工入职执行手册.doc
- 初一班跳蚤市场营销计划书.doc
- 四川社区e通操作小手册.doc
- 中国咖啡商城网与咖啡厅合作方案.doc
- 国际标准 IEC 60534-4:2006 EN-FR 工业过程控制阀-第4部分:检查和例行测试 Industrial-process control valves - Part 4: Inspection and routine testing.pdf
- 国际标准 IEC 60534-4:2006 EN-FR Industrial-process control valves - Part 4: Inspection and routine testing 工业过程控制阀-第4部分:检查和例行测试.pdf
- 高中物理考试34条重要提醒.docx
- 高中地理考试基础知识汇编.docx
- 高中英语作文攻略:句式的多变运用.docx
文档评论(0)