钢管混凝土拱桥施工监控与拱肋吊装计算.pdf

Construction Monitoring of CFST Arch Bridges and Calculation during Erecting Steel Tubular Arch Rib ABSTRACT Since rib-hoisting of concrete-filled steel tubular (CFST) arch bridges is a very complex process, construction monitoring is necessary to satisfy the requirements of design strength and final bridge alignment. Based on the real situation of the Bailu bridge that is under construction in Jian City, Jiangxi Province, the detailed construction scheme is presented. is implemented t