工程建设标准强制性条文CPECS-B-8房屋建筑部分(英文版).docVIP

工程建设标准强制性条文CPECS-B-8房屋建筑部分(英文版).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程建设标准强制性条文CPECS-B-8房屋建筑部分(英文版).doc

Chapter VIII Quality and safety of engineering construction 1. Construction quality of earth foundation 1.1 General rules Specification for engineering construction of earth base and foundation GBJ 202-83 1.0.3 When engineering construction work for earth base and foundation is adjacent to existing construction or structural items, the following shall be observed: I.Before starting construction work, details of the original structure of existing buildings or structural items shall be informed of. II.Construction work for earth base and foundation, if affects use and safety of adjacent buildings or structural items, effective measures shall be taken together with institution concerned. 1.0.4 Category, size standard number and concentration of materials and manufactured products shall meet designing requirements. 1.0.7 During construction of earth base and foundation, hidden items shall be inspected and accepted in intermittence, only after qualified can the next procedure be continued. After finished, it shall be accepted by inspection. 1.08 Earth base and foundation construction in winter shall meet the following rules: I.Ice and snow at site ways and construction place shall be cleaned away. II.Frozen soil that affects construction work shall be dug out and removed; freezing prevention measures shall be taken. III.Frozen materials are prohibited to use. 1.2 Soil with special properties Specification for construction s in wet-pitfall loess area GBJ 25-90 5.1.1 Construction of buildings and their attached projects shall be in a reasonable sequence according to specific characteristics and designing requirements of wet-pitfall loess to prevent construction used water and rainwater flow into the earth foundation, which leads to wet-pitfall. 5.4.5 When crack of building due to wet-pitfall of foundation is found, construction work shall stop temporarily, shut off water source concerned, find out cause and range of water submerging and observe sink and cracking

文档评论(0)

书屋 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档