混凝土大坝安全监测规范.docxVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土大坝安全监测规范A2 Testing itemsTesting items for Concrete dam refer to form A2Sheet of testing items for safety of concrete damItems/construction period / first impounding time / first impounding period / operating timeDisplacement 1/10 days~1/ 1 month 1/day~1/ 10 days 1/ 10days~InclinationJoint and crack outside of damBank slope stability of close-damSeepage dischargeUplifting pressureSeepage pressureSeepage flow around the dam Water analysisStress and strainTemperature of dam and dam foundation Inside joint and crack of damReinforcement, steel plate, anchor wire, anchor tie stressWater level at upstream and down streamTemperature of reservoirAtmosphere temperaturePrecipitationMud filling front of dam FreezingMonitoring net of dam surfaceMonitoring net of dam vertical displacementScour-and-fill at downstreamNotes:All testing frequency is the minimum requirements reading by man power on usual condition. On special conditions such as flood and earthquake, it should be tested more frequently, which can be decided according to the condition.During the construction period, when the pouring is accelerated, the deforming and stress should be tested according to the superior limit. During the first impounding period, due to the fast rising speed of the water level, it also should be tested according to the superior limit. During the operating, if the changing speed of deforming and seepage is fast, it also should be tested according to the superior limit. When the condition is stability, it can be tested according to the low limit. After several years of operating, the testing times can be reduced or some items can be cancelled after being approved by relevant departments. However, if the water level is higher than the pre-time operating level. The testing should be taken like what is done at the first time.As for the low part of the dam, the deforming test times can be reduced to once a season.The checking times refer to item 5.0.1.B2Checking items of monitoring equip

文档评论(0)

企管文库 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档