- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业设计(论文)文献翻译 题目:基于单片机的数字钟的设计学院:自动化学院 专业:自动化基于单片机的英语论文及翻译Programmable controllersFrom a simple heritage, these remarkable systems have evolved to not only replace electromechanical devices, but to solve an ever-increasing array of control problems in both process and nonprocess industries. By all indications, these microprocessor powered giants will continue to break new ground in the automated factory into the 1990s. HISTORY In the 1960s, electromechanical devices were the order of the day ass far as control was concerned. These devices, commonly known as relays, were being used by the thousands to control many sequential-type manufacturing processes and stand-along machines. Many of these relays were in use in the transportation industry, morespecifically, the automotive industry. These relays used hundreds of wires and their interconnections to effect a control solution. The performance of a relay was basically reliable - at least as a single device. But the common applications for relay panels called for 300 to 500 or more relays, and the reliability and maintenance issues associated with supporting these panels became a very great challenge. Cost became another issue, for in spite of the low cost of the relay itself, the installed cost of the panel could be quite high. The total cost including purchased parts, wiring, and installation labor, could range from $30~$50 per relay. To make matters worse, the constantly changing needs of a process called for recurring modifications of a control panel. With relays, this was a costly prospect, as it was accomplished by a major rewiring effort on the panel. In addition these changes were sometimes poorly documented, causing a second-shift maintenance nightmare months later. In light of this, it was not uncommon to discard an entire control panel in favor of a new one with the appropriate components wired in a manner suited for the new process. Add to this the unpredictable, and potentially high, cost of maintaining these
您可能关注的文档
- 毕业论文 电子相关专业 基于AVR M8的简易数字钟设计.doc
- 毕业论文 100t 龙门吊设计.doc
- 毕业论文 110KV等级综合自动化变电站.doc
- 毕业论文 220kv变电站 220kV一次降压变电所电气部分设计.doc
- 毕业论文 5010T,跨度28m,双粱桥式起重机结构设计.doc
- 毕业论文 5300TEU集装箱船211分段施工设计.doc
- 毕业论文 《10加几和相应的减法》教学设计方案.doc
- 毕业论文 ACTECO系列的SQR477F发动机常见故障诊断.doc
- 毕业论文 andriod_音乐播放器.doc
- 毕业论文 C616车床经济型数控改装设计——刀架的进给伺服系统设计.doc
- 《宫腔镜诊疗规范编制说明征求意见稿.pdf
- 《高精度大扭矩铣削磨削电主轴一般技术要求》(征求意见稿).docx
- 铁路机车车辆自动识别设备技术条件 编制说明.docx
- 《关键生产设备预测性维护 第3部分 故障诊断及预测方法》(征求意见稿).docx
- 《佛山陶瓷品牌 30 强评价规范(征求意见稿)》.pdf
- 信息与文献 编写规则 第4部分:数据论文 征求意见稿.pdf
- 信息与文献 都柏林核心元数据元素集 第1部分:核心元素 征求意见稿.pdf
- DB2327T 100-2024气象灾害调查技术规范.docx
- 柚果可食率无损检测 机器视觉与X射线成像联合法-征求意见稿.docx
- 风力发电设施防护涂装技术规范 编制说明.pdf
文档评论(0)