网站大量收购闲置独家精品文档,联系QQ:2885784924

呼和浩特市安泰小区住宅楼采暖及防排烟设计毕业设计说明书.doc

呼和浩特市安泰小区住宅楼采暖及防排烟设计毕业设计说明书.doc

  1. 1、本文档共92页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科生毕业设计说明书 题 目:呼和浩特市安泰小区住宅楼采暖及防排烟设计 学生姓名: 学 号: 专 业:建筑环境与设备工程 班 级: 指导教师: 呼和浩特市安泰小区住宅楼采暖及防排烟设计 摘 要 关键词:;; The design of heating and smoke controlling about a commercial building of Antai district in Hohht Abstract The project is about the design of heating, ventilation and smoke controlling about a commercial building in Hohht; The building of design consists of Residential buildings,subsurface layers,Underground construction 0f two floors and high-rise building of eighteen floors. The paper requirements designing a reasonable heating and smoke control system for building which according to civil engineering and other relevant information .At the same time , the paper design a district heating station which must rationalization . The project about heating requirements metering heat for the users. The Design of heating choices downfeed and direct return riser system which based in construction of the specific circumstances form. The house heating system using radiators doule pipe reverse-return system indoor. The purpose about distribution arrangements in the system are to simplify the system, saving pipe, buried underground to reduce, saving interior space and concent requirements from the users. The design of smoke control are main contenders of high-rise building. According to the 《criterion on the fireproofing in high-rise building for daily usage 》, It chooses positive pressure ventilation smoke controlling and natural discharge air sestem, set up a delivery outlet every two-tier in stair well and every one-tier in front floor. The blower is installed in the roof. Underground construction and the positive pressure ventilation use the same furnace through the window for the smoke controlling. Key words: heating; household heat metering; smoke controlling 目 录 摘 要 I Abstract II 第一章 设计概况及资料 1 1.1 设计题目 1 1.2 工程概况 1 1.3 设计的原始资料 1 1.3.1 气象参数 1 1.3.2 热源资料 2 1.3.3 土建资料 3 1.4 围护结构的热工性 5 1.4.1 围护结构传热系数的确定 5 1.4.2 校核围护结构最小传热热阻 7 1.5 小结 9 第二章 采暖热负荷计算 10

文档评论(0)

追风少年 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档