- 16
- 0
- 约1.75万字
- 约 11页
- 2017-09-19 发布于河南
- 举报
Quiz Keywords
Quiz 1:
How does project level time tracking work?
Answer:
Project level time tracking define the percent of the workload of every account, every project member on different work for a period of time.
Project-level time tracking enables project teams to track and analyze what tasks are performed by which project members in DevTrack projects.
How to define which columns can be displayed in the inter-project linked issues history page?
Answer:
We can define that in follow path: Admin| advanced features| inter-project setting| issue history page, we can chose the columns whic
您可能关注的文档
最近下载
- 新22S4 专用给水工程建筑工程图集.docx VIP
- 基于PLC的模糊PID水箱液位控制系统设计.doc VIP
- 杂交手术室11月份理论考核试题及答案.docx VIP
- 中国石油招聘考试试题及答案.docx VIP
- 2025报账员面试题库及答案.docx VIP
- 【2025.11初一期中】海淀区数学答案.pdf VIP
- 4.7.1三角防护架项目四施工技术任务7防护工程57课件讲解.pptx VIP
- 霞浦事业单位招聘考试题历年公共基础知识真题及答案汇总-综合应用能力第十期.docx VIP
- 2020年广州市增城市卫生系统护士考试《护理学基础知识》真题精选试卷(含解析).pdf VIP
- 2025《阜阳金种子酒业公司招聘渠道建设现状、问题及对策》12000字.doc VIP
原创力文档

文档评论(0)