- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
附 录
UPS-500s mould is not disconnected the adjustment of power supply work Dian
UPS-500 is not disconnected the power supply and adjusts his work point for user provides three fine tuning potentiometres, and introduces as follows at present:
(1) potentiometre VR1: is used to adjust the voltage being charged of storage battery. The battery is charged, and the circuit is a permanent voltage source. This signifies, and it will stop to be charged voluntarily when battery voltage is filled to the rated value. The circuit is when designing. Serve as this definition of voltage to 27 volts. This is charged, and the measurement method of voltage is: dismantling the tie of battery after inserting UPSs power supply the 220 volts local junction circuit electrical network, the resistance of 10W is as the false load to simple 200 Ω on the rejoin, and ascertains by measuring or surveying this voltage from the connection cable of battery more here. Also that is to say: 27 volts indicate voltage when being charged the circuit no-load, and is not voltage when taking the storage battery load. This point will especially be paid attention to when adjusting VR1. Otherwise the parts are burnt up greatly because of the charging current is crossed easily in the committee, or damage the storage battery because of crossing pressing to be charged.
(2) potentiometre VR2: when UPSs power supply is in contrary(ly) to become the ware when supplying power, and can cross the effective dimension that the potentiometre was adjusted UPS power supply export side wave voltage by way of adjusting VR2. The adjustment method is: pulling out the 220 volts local junction circuit power supplies not is disconnected with the voltmeter at UPS measuring voltage on the export of the power supply socket. Adjusting VR2, gradually makes to send out voltage to achieve the fixed value.
(3) potentiometre VR4: is used to adjust UPS not to be disconnected the power supply changing to becoming the con
您可能关注的文档
- 学生学籍档案管理系统及其登陆系统的开发 毕业设计开题报告.doc
- 遗传算法学习分类系统的研究 开题报告.doc
- 智能家居控制系统论文开题报告.doc
- 智能小区安防系统 开题报告.doc
- [毕业设计论文]反走样技术的研究与实现 文献综述.doc
- [毕业设计论文]股票市场羊群效应文献综述.doc
- [毕业设计论文]机械手的自动化控制系统的PLC实现方法研究文献综述.doc
- 基于DCT变换的水印算法实现文献综述.doc
- 基于虚拟现实技术的网络 ---学习环境设计与开发 文献综述.doc
- 试论跨国公司外汇风险及其管理研究的文献综述.doc
- CNAS-CL63-2017 司法鉴定-法庭科学机构能力认可准则在声像资料鉴定领域的应用说明.docx
- 12J7-3 河北《内装修-吊顶》.docx
- 12N2 河北省12系列建筑标准设计图集 燃气(油)供热锅炉房工程.docx
- 内蒙古 12S8 排水工程 DBJ03-22-2014.docx
- 山西省 12S10 12系列建筑标准设计 管道支架、吊架.docx
- 16J601-木门窗标准图集.docx
- 12J8 河北省12系列《 楼梯》.docx
- CNAS-GL37 2015 校准和测量能力(CMC)表示指南.docx
- CNAS-RL02-2016 能力验证规则.docx
- 津02SJ601 PVC塑料门窗标准.docx
文档评论(0)