- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Contents
一.编制依据asis of compilation
1-1设计要求Design requirements
1-2技术Technical base
二.工程概况General situation
2.1场地概况 Site conditions
2.2工程地质及水文地质Engineering geology hydrogeology
2.3基坑支护设计Foundation Pit supporting system design
三.监测内容及原则要求
Contents of Monitoring and in principle
3.1监测目的purpose of Monitoring
3.2监测对象Object of Monitoring
3.3监测工作指导原则Guide principle for Monitoring
3.4监测要求requirements for Monitoring
四.监测点的布设Arrangement of Monitoring points
4.1监测点的布置原则Principles of arrangement of monitoring points
4.2监测点的布设Layout of monitoring points
五.监测方法Monitoring Method
六.监测周期及频率Monitoring period and frequency
七.监测控制标准Control standards for monitoring
八.数据处理及信息反馈Data processing and information feedback
九.信息化施工与险情预报Informatization construction and risk prediction
十.监测组织Monitoring Organization
十一.确保质量和安全技术措施Technical measures for ensuring quality and safety
十二.设备型号及附件清单List of equipment, models and accessories
十三.监测平面布置图及记录表格Monitoring floor plan and record forms
一、Basis of compilation
1.1 Design requirements
According to the design drawings for 《pump house and culvert box Foundation pit support engineering》which designed by Hangzhou KindBO geotechnical engineering technology Ltd , design requirements are: to ensure the safety of Foundation pit construction, special monitoring program should be developed and strictly enforced in the Foundation pit excavation process. Identified monitoring programmes should be implemented in the general contractor and design review , construction must be guided according to accurately predict and feedback, if necessary, to modify the design, ensure construction schedule and safety.
1.2 Technical base
1《Foundation pit supporting construction drawings of pump house and culvert box》
2《Code for geotechnical engineering investigation》GB50021-2001
3《Code for engineering survey》GB50026-2207
4《Specification for deformation measurement of buildings》JGJ/T8-2007
5《Technical code for engineering of Foundation pit》DB42/159-2204
6《Construction technolo