槽盒施工方案.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
General 1.1BASF-YPC company Ltd IPS project IOU SCTF, the scope of instrument trays installation: diagrams main piping frame 、diagrams pipe rack etc. 1.2Instrument trays 800*200, quantity 540 m The specification of channel steel supports: 800 mm , quantity 540m 1.3The quantity of the other instrument trays 1500m 2.0Construction basis 2.1Yang Zi Petrochemical Design Institute, drawing list:70-00-00 2.2Code for construction and acceptance of automation instrumentation engineering GB50093-2002 2.3Standard for quality verification evaluate of automation instrumentation engineering GBJ131-90 2.4 Technical code of construction of instrumentation engineering for petrochemical industry. SH3521-19999 3.0 Technology demand and measure. 3.1Acoroding with the instrument trays layout drawing, compile the instrument construction measure. 3.2Before the construction, have the technology clarification and the work indication, confirm the relative prescriptions of the technology demand and the construction specification. 3.3Speciality joins, pay attention to speciality joins and the crisscross distance of all kinds of relative speciality duing the construction. 3.4 The cable trays fabrication specification is accord with the design’s demand, properly select material, combine, weld burnish, rust remove and pain. 3.5When the main cable trays are installed, the installation location shall be accord with the trays layout drawing, and use the M8*30 galvanizing bolt to connect with the frame. 3.6Before installing the main trays, inspect that the specification and type shall be conformed to the demand of the design, good semblance and rustless phenomenon. 3.7The main instrument trays are lay on the channel steel support, use 30*30*4 angel steel welding the channel steel sides, so that secure the instrument trays. 3.8When all the main instrument trays have been installed, after integrated inspecting qualified with IMT, the next work shall be carried out. 3.9For the widely layout, the breach

文档评论(0)

企管文库 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档