第32卷 第4期 V ol32 No4
2 0 1 0年 8 月 Journal of ShenyangUniversity ofTechnology Aug 2 0 1 0
1
: 1000- 1646(2010)04- 0454- 05
1, 2 1 1
孙海霞 , 赵 文 , 王钊宇
(1, 110004; 2, 110870)
: , 1,
,
. ABAQUS
, ,
, , .
, .
: ; ; ; ; ; ; ;
: TU 94; U 45543 : A
Monitoring and numerical simulation of underground pipeline settlement
库
during shield tunneling construction
例
1, 2 1 1
SUN Ha-ixia , ZHAO Wen , WANG Zhao-yu
( 1. CollegeofResource and Civil Engineering, Northeastern University, Shenyang 110004, China; 2. School ofArchitecture
案
and C ivilEngineering, ShenyangUniversity ofTechnology, Shenyang110870, China)
E
A
Abstract: In order to study the influence of subway construction on the underground pipeline, the
underground pipeline settlement rule induced by shield tunneling construction and the corresponding locale
C
monitoring datawere analyzed with taking ShenyangM etro Line 1 as engineering example. And the safety and
reliability of theadopted constructionmethod andmonitoring schemewere verified. A three-dimensionalFinite
模
ElementModel ( FEM ) with considering various influencing factormore roundly and reasonably was estab-
lished byABAQUS software. W ith taking the practical stratum parameters, construction parameters and pipe-