- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
绗?9 鍗 绗? 鏈 鎺 鍒 涓 鍐 绛 2014 骞 8 鏈
Vol. 29 No. 8 Control and Decision Aug. 2014
鏂囩珷缂栧彿: 1001-0920 (2014) 08-1458-07 DOI: 10.13195/j.kzyjc.2013.0842
鍩轰簬鎹熺泭浜戞ā鍨嬬殑鍒堕€犺溅闂撮噸璋冨害鍐崇瓥鏂规硶
鍒樻槑鍛? 寮 鐜? 寮犻摥閼? 钁涜寕鏍? 鎵 闈
(鍚堣偉宸ヤ笟澶у鏈烘涓庢苯杞﹀伐绋嬪闄紝鍚堣偉230009)
鎽 瑕? 閽堝鍒堕€犺溅闂撮噸璋冨害瑙﹀彂鏈哄埗闂, 寤虹珛浜嗗埗閫犺溅闂撮噸璋冨害鎹熺泭鍑芥暟, 鎻ず浜嗙敓浜ц溅闂撮噸璋冨害杩囩▼鎹熷け鍙
澧炵泭鐨勫彉鍖栬寰? 寮曞叆浜戠悊璁烘祴搴﹂噸璋冨害鎹熺泭鐨勪笉纭畾鎬? 浣跨敤閫嗗悜浜戠畻娉曡绠楅噸璋冨害澧炵泭浜戝拰鎹熷け浜戠殑鏁板瓧鐗瑰緛,
鏍规嵁浜戝舰鎬侀娴嬮噸璋冨害鎹熺泭鍙樺寲瓒嬪娍. 鎻愬嚭涓€绉嶅熀浜庢崯鐩婁簯妯″瀷鐨勯噸璋冨害鍐崇瓥鏂规硶浠ュ垽鏂槸鍚﹂渶瑕侀噸璋冨害, 骞跺埄鐢
鏈€浣虫崯鐩婃瘮鐢勯€夐璋冨害鏂规浠ュ吋椤剧敓浜х郴缁熺殑绋冲畾鎬у拰鏈夋晥鎬? 鏈€鍚? 閫氳繃瀹炰緥楠岃瘉浜嗚鏂规硶鐨勫悎鐞嗘€у拰瀹炵敤鎬?
鍏抽敭璇岤 閲嶈皟搴﹂┍鍔ㄦ満鍒讹紱浜戠悊璁猴紱鎹熺泭浜戞ā鍨嬶紱鎹熺泭姣
涓浘鍒嗙被鍙耳 F406.2 鏂囩尞鏍囧織鐮? A
Rescheduling decision method of manufacturing shop based on pro铿乼-loss
cloud model
LIU Ming-zhou, ZHANG Xi, ZHANG Ming-xin, GE Mao-gen, HU Jing
(School of Mechanical and Automotive Engineering锛孒efei University of Technology 锛孒efei 230009 锛孋hina.
Correspondent 锛歀IU Ming-zhou 锛孍-mail 锛歩saacaz@163.com)
Abstract: Aiming at the problem of rescheduling triggering mechanism in manufacturing shops, the rescheduling gain and
loss functions are established to reveal the law of tradeoff between pro铿乼 and cost during the rescheduling process. The cloud
theory is applied to measure the uncertainty of rescheduling tradeoff. Then the reverse cloud algorithm is used to calculate the
numerical characteristics of gain and loss cloud. Furthermore, the cloud shape is used to predict the tendency of rescheduling
tradeoff. A decision method based on the gain-loss cloud model is proposed to determine whether or not reschedule, and
the pre-schedule that ensures the stability and ef铿乧iency of production system can be selected by using the optimal gain-loss
ratio.
文档评论(0)