大同矿区四老沟矿4#煤层的设计(含CAD图纸全套).doc

大同矿区四老沟矿4#煤层的设计(含CAD图纸全套).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
买文档后送图纸,QQ194535455

买文档后送图纸,QQ 194535455 摘 要 本次设计是大同矿区四老沟矿4#煤层。该矿位于大同煤田东北端,距大同市25Km,距口泉站5.3Km。井田内有公路贯穿,交通方便。 据井田地质资料:该井田煤层平均厚度为2.1m,经鉴定为低瓦斯矿井,瓦斯相对涌出量平均为0.1m3/t。煤层有爆炸危险性。煤的自燃倾向等级为易自燃。根据矿井涌水量预测,该矿井正常涌水量为3800m3/d。 设计采用斜井煤门单水平开拓方式,共开掘有两个进风井(主斜井、副斜井)和一个回风井。井田共划分有四个盘区,开采煤层为4#。矿井采煤方法为综合机械化开采方式,综合机械化掘进,生产区队设置有:一个综采队和两个机掘队。 矿井达产时的首采工作面位于401盘区,该盘区划分为20个区段,工作面长度为200m,推进长度为2000m,回采顺序采用后退式、回采工艺中厚煤层单一走向长壁综合机械化采煤法,采用“四·六制”作业制度。采空区采用全部跨落法管理顶板。 关键词:矿井开拓;采煤方法;综合机械化采煤 ABSTRACT The design is mine in Datong Coal Mining Area Silaogou 4 # coal seam. Datong Coal mine located in north-east side, from the City 25Km. Mine Highway runs through there and convenient. According to geological data mine: the mine seam thickness of 2.1m, was identified as the low-gas coal mine, coal gas emission on the group average of 0.1 m3 / t. The danger of coal explosion. Level of the natural tendency of coal to spontaneous combustion. Mine discharge in accordance with the forecast, the mine water for normal Chung 3800m3 / d. Design uses a single level of Shihmen inclined to open up the way of opening into the ventilation shaft there are two (main slope, the Deputy inclined) and three return air shaft . Mine were set into eight areas, the exploitation of coal for 4#. Mine mining method for the comprehensive mechanization caving mining methods, mechanized tunneling, the production team set up are: a mechanized caving team and two local excavation team. Mine production mining face at the time of the first panel at the East, , face length of 200m, to promote the length of 2000m, the order of the use of retreat mining-type, in single pass coal mining technology of mechanized top coal caving mining Coal Act, the system 4·6 operating system. Goaf method make use of all cross-loading roof management. Keywords:mine development; mining methods;mechanized mining 目 录 1 矿井概述及井田地质特征 1 1.1矿区概述 1 1.1.1地理位置 1 1.1.2地形、地貌 1 1.1.3交通条件及居民点分布 1 1.1.4水文条件 3 1.1.5居民用水情况 3 1.2井田地质特征 4 1.3井田地质构造 7 1.3.1断层 7 1.3.2褶曲 7 1.3.3陷落柱 8 1.3.4岩浆岩 9 1.4煤层特

文档评论(1)

  • 用户头像 游客 2016-09-24 19:21:05
    你好,通过QQ无法联系到你
***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档