- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(Feb 2003)
LIGHTNING PROTECTION INSTALLATION
GENERAL SPECIFICATION
1. SATISFACTORY INSTALLATION
The whole of the installation shall be carried out in accordance with:
(a) The latest S.A.B.S. Code of Practice for the Protection of Structures against Lightning - S.A.B.S. 03
; SABS IEC 61024 (1) , 61024 (1 -1); SABS IEC 61312 (1) ; SABS IEC 61662 NRS 042.
(b) The KwaZulu-Natal Department of Works General Electrical Specification.
(c) The Municipal By-Laws and any other special requirements as deemed necessary by the Local
Supply Authority;
(d) Local Fire Regulations.
2. S.A.B.S. APPROVED DRAWINGS
SABS Approved drawings are not required for this project.
3. TEST ON COMPLETION
Upon completion of the lightning protection system, the following tests shall be witnessed by an appointed
representative of the Employer. The results shall be recorded on suitable test certificates which must be
signed by both the Contractor and the Employers representative. A sketch must be included on each test
certificate indicating the positions of each earth electrode in relation to some permanent reference point. It
must also indicate the positions at which tests were carried out, the type of test and the results of these
tests.
3.1 Earth Resistance Test
The Earth Resistance Test shall involve measuring the resistance to earth of each rod-type
electrode, or group of rod-type electrodes, or trench earth which would normally be connected to one
down-conductor or earth terminal. This test must be made with the electrodes completely
disconnected from any part
文档评论(0)