2006 级冶金工程专业《铁冶金学(英文)》A 卷
参考答案
1. Putting the proper words or phrases in blanks (1 point for each blank, 10 points in total,
put in either in English or Chinese)
1) From bottom to top, a blast furnace are generally divided into five parts called 炉缸 ,
炉腹 , 炉腰, 炉身,and 炉喉。
2) The main raw materials required for blast furnace ironmaking process are 含铁物料,
熔剂 and 焦炭。
3) There are two kinds of top charging system now, one is 钟式炉顶装料, and another is
和 无料钟炉顶装料
2. Giving a brief explanation for each follo