网站大量收购闲置独家精品文档,联系QQ:2885784924

构建湿地堵塞问题的研究.pdfVIP

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2 3 Vol. 2 , No. 3 2004 ENVIRONMENTAL SCIENCE May, 2004 * , , , , ( , 430072, E-mail: fuguiping@ sina. com) : ( IVCW) . 2~ mm , , IVCW . IVCW , 1 ~ 30cm . IVCW 2 , 1 cm , 1 cm , IVCW , . . : ( IVCW) ; ; ; : X 144 : B : 02 0-3301( 2004) 03- 0144-06 Studies on Clogging of the Constructed Wetland FU Gu-i ping, WU Zhen-bin, ZHANG Sheng, CHENG Shu-i ping, HE Feng ( State Key Laboratory of Freshwater Ecology and Biotechnology, Institute of Hydrobiology , Chinese Academy of Sciences, Wuhan 430072. E-mail:fuguiping@sina. com) Abstract: The parameters of substrate related to clogging, such as the grain size, t he filtration rate and organic substance in the sub- strate, were investigated in the integrated vertica-l flow constructed wetland ( IVCW) . T he substrate of IVCW w as collected by a spe- cific sampling tube in situ and the infiltration experiment showed that the filtration rate of substrate increased wit h the depth of sub- strate and the minimum filtrat ion rate existed 1 ~ 30cm below the surface of substrate. The amount of organic substances in upper 1 cm layer of the substrate w as limited and even less in deeper layer after fifty two-month running, and t his revealed that IVCW w as operating steadily and no clogging was observed. Considering the factors related to clogging, the strategy to prevent and recover the clogging phenomenon was put forward. Key words:integrated vertica-l flow constructed w etland ( IVCW) ; clogging; filtration rate; organic substance 1 , , . 111 ( IVCW) 2 81m ( 9m @ 9m) 112m A B 2 , 2 , [ 1~ 4] .

文档评论(0)

***** + 关注
实名认证
文档贡献者

本账号下所有文档分享可拿50%收益 欢迎分享

1亿VIP精品文档

相关文档