- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工组织设计97691.doc
天洋城39号楼工 程
施工组织设计
建设单位:XXXX开发有限公司
编制单位:XXXXXXX有限公司
编 制: 职称:工程师
审 批: 职称:高级工程师
年月日位于河北省三河市燕郊开发区,总建筑面积m2,。,交通运输方便
This engineering is day the city and # building project, located in hebei province SanHeShi yan jiao development zone, to all the cast-in-place reinforced concrete shear wall structure, underground 2 layer, the ground and layer; Eaves is 95.5 meters tall, a total construction area of 40480.85 m2 including 38255.65 m2 construction area of the earth, the underground construction area of 2225.2 m2. HanWang road in the east, north near yifeng street, west side has been cloud river village, to the east south lane that has the first industrial park and HanWang company. This engineering things were 44 side # building and 33 # buildings, north of 38 # buildings, engineering construction for the south road. , the transportation is convenient.
Through this subject research, enabled me to the whole project the construction organization design has a deep understanding, first with the features of the project, the construction site features, construction condition as the foundation of the construction organization design, in this foundation to building regulations, according to on the basis of construction project management organization and function division of labor, the construction plan and construction schedule, the construction layout, the site of the project and safety management measures, technical and economic indexes of organization plan. Let I to a project building process can do fairly well. In truth, strengthening the training we social consciousness, scientific research basic training and improve the comprehensive practice ability and the quality and so on, play a very significant role. Cultivated my innovation ability, and the practice ability and entrepreneurial spirit. I believe that the graduation design can shorten in the future work on the period of adjustment, can make me into the role and function as soon as possible.
关键词:剪力墙
文档评论(0)