- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
标准机械设备安装检验程序.doc
XXXXXX FIELD DEVELOPMENT PROJECT
COSIGN
DISCIPLINE SIGNATURE DATE INSPECTION PROCEDURE
FOR
MECHANICAL FACILITIES INSTALLTION
PAGE X OF X REV. DATE DESCRIPTION BY CH ‘K. APPRO. CLIENT INSPECTION PROCEDURE FOR MECHANICAL FACILITIES INSTALLATION OFFSHORE OIL ENGINEERING CO.,LTD. CNOOC DOCUMENT NO. REV. CERTIFI. NO. DOC-XXXXXX 0 XXXXX
CONTENTS
SCOPE
REFERENCE STANDARDS
PERSONNEL QUALIFICATION
INSPECTION EQUIPMENT
INSPECTION PROCEDURE
ACCEPTANCE STANDARDS
INSPECTION REPORTS
1.0 SCOPE
This procedure covers the methods, techniques and acceptance standards for mechanical facilities installation inspection of XXXXXX project.
2.0 REFERENCE STANDARD
Client’s Specification
API RP 14C latest edition
OSHA
SPEC XXXXXX
3.0 PERSONNEL QUALIFICATION
Personnel performing this inspection shall be trained for using the gauge of mechanical facilities installation inspection. (gradienter, etc.)
4.0 INSPECTION EQUIPMENT
Inspection Equipment
Tape Steel tape should be appliedd to measure the location size of equipment.
Dial guage should be applied to check parallel alignment of coupling ends and shaft centers.
4.2 Periodic Calibration
All equipment mentioned above shall be periodically calibrated by a qualified and recognized test authority.
5.0 INSPECTION PROCEDURE
5.1 INSPECTION ITEMS
The following inspections shall be conducted:
a. Receiving inspection for equipment
b. Foundation inspection.
c. Alignment inspection of equipment.
d. Alignment inspection of pumps and other rotating machinery.
e. Inspection of assembly of inner parts.
f. Inspection of filling material.
5.2 INSPECTION PROCEDURES AND STANDARDS
5.2.1 All inspection/test equipment and instrument shall be calibrated.
5.2.2 Foundation inspection
Confirm that the beams or floors have been fabricated and finished correctly to assure the sufficient installation of equipment.
5.2.3 Inspection of stationary equipment
5.2.3.1 Inspection item
Pe
您可能关注的文档
- 施工组织范本.doc
- 施工组织设计(钢管和PE管).doc
- 施工组织设计用模板.doc
- 施工节点注解.doc
- 施工设计(更新版).doc
- 无“编”的尴尬.doc
- 无刷直流电机仿真.doc
- 无处不在的概率论.doc
- 无条件积极关注.ppt
- 无源滤波器.doc
- 2025年全国演出经纪人考试题库带答案(突破训练).docx
- 2025年演出经纪人政策法规及经纪实务考试题库(夺冠系列).docx
- 2025年全国演经纪人考试题库含答案(突破训练).docx
- 2025国网安徽省电力有限公司高校毕业生招聘约136人(第二考前自测高频考点模拟试题最新.docx
- 2025年演出经纪人员资格认定考试考点梳理试题库含答案(综合题).docx
- 2025年职业资格考试《演出经纪人》基础知识试题库带答案(能力提升).docx
- 2025年演员经纪人考试题库推荐.docx
- 2025年全国经纪人考试题库(真题汇编).docx
- 2025年演出经纪人员资格认定考试考点梳理试题库附答案(模拟题).docx
- 2025年演出经纪人员资格认定考试考点点睛考试题库汇编.docx
原创力文档


文档评论(0)