- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2014年高考英语二轮阅读理解专题冲刺训练及解答 7.doc
2014届高考英语二轮最新冲刺专题训练:阅读理解7
阅读理解A
According to the US government, wind farms off the Pacific coast could produce 900 gig watts of electricity every year. Unfortunately, the water there is far too deep for even the tallest windmills (see picture) to touch bottom. An experiment under way off the coast of Norway, however, could help put them anywhere.
The project, called Hywind, is the world’s first large-scale deepwater wind turbine(涡轮发电机).Although it uses a fairly standard 152-ton,2.3-megawatt turbine, Hywind represents totally new technology. The turbine will be fixed 213 feet above the water on a floating spar(see picture),a technology Hywind’s creator, the Norwegian company StatoilHydro, has developed recently. The steel spar, which is filled with stones and goes 328 feet below the sea surface, will be tied to the ocean floor by three cable(缆索);these will keep the spar stable and prevent the turbine from moving up and down in the waves. Hywind’s stability(稳定性)in the cold and rough sea would prove that even the deepest corners of the ocean are suitable for wind power. If all goes according to plan, the turbine will start producing electricity six miles off the coast of southwestern Norway as early as September.
To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar’s to design a new kind of wind turbine, one whose gearbox(变速箱) sits at sea level rather than behind the blades (see picture )
Hywind is a test run, but the benefits for perfecting floating wind-farm technology could be extremely large. Out at sea, the wind is often stronger and steadier than close to shore, where all existing offshore windmills are planted. Deep-sea farms are invisible from land, which helps overcome the windmill-as-eyesore objection. If the technology catches on, it will ope
您可能关注的文档
- 2014年高考英语二轮复习真题演练《连词与介词》含解析.doc
- 2014年高考英语二轮复习真题演练《阅读理解》含解析.doc
- 2014年高考英语二轮复习真题演练《非谓语动词》含解析.doc
- 2014年高考英语二轮复习考点模拟《书面表达》含解析.doc
- 2014年高考英语二轮复习考点模拟《代词》含解析.doc
- 2014年高考英语二轮复习考点模拟《冠词》含解析.doc
- 2014年高考英语二轮复习考点模拟《动词和动词短语》含解析.doc
- 2014年高考英语二轮复习考点模拟《名词》含解析.doc
- 2014年高考英语二轮复习考点模拟《名词性从句》含解析.doc
- 2014年高考英语二轮复习考点模拟《定语从句》含解析.doc
- 2014年高考英语二轮阅读理解专题冲刺训练及解答 8.doc
- 2014年高考英语二轮阅读理解专题冲刺训练及解答 9.doc
- 2014年高考英语二轮阅读理解专题训练10(含解析).doc
- 2014年高考英语二轮阅读理解专题训练11(含解析).doc
- 2014年高考英语二轮阅读理解专题训练12(含解析).doc
- 2014年高考英语二轮阅读理解专题训练13(含解析).doc
- 2014年高考英语二轮阅读理解专题训练14(含解析).doc
- 2014年高考英语二轮阅读理解专题训练15(含解析).doc
- 2014年高考英语二轮阅读理解专题训练16(含解析).doc
- 2014年高考英语二轮阅读理解专题训练17(含解析).doc
最近下载
- 高边坡专项施工方案(专家论证版).pdf VIP
- 《工程化学基础》教案-第3章-2011.ppt VIP
- 抗日英雄王二小.pptx VIP
- 第5课 用发展的观点看问题-【中职专用】2024年中职思想政治《哲学与人生》金牌课件(高教版2023·基础模块).pptx VIP
- 老友记台词剧本第一季第1集中英双语左右对照.pdf VIP
- 形势与政策社会实践报告模板.docx VIP
- 全套SPC表格(很全面) CPK.xls VIP
- T_CI 540-2024 红枣蒸馏酒生产技术规程.pdf
- 施工组织设计方案(高速公路通信迁改).docx VIP
- Part3-4 Unit6 Craftsmanship课件高一英语(高教版基础模块2).pptx
文档评论(0)