- 1、本文档共63页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FIDIC学习课件系列Conditions_of_Contract_for_Construction.ppt
Conditions of Contract for Construction Dr. X. ZHENG Tel.: 0086-10E-mail: xiuhuazh@cugb.edu.cn Forward The General Conditions and the Particular Conditions will together comprise the Conditions of Contract governing the rights and obligations of the parties. It will be necessary to prepare the Particular Conditions for each individual contract, and to take account of those sub-clauses in the General Conditions which mention the Particular Conditions. Where example wording(范例措辞) is amended, and in all cases where other amendments or additions are made, care must be taken to ensure that no ambiguity is created, either with the General Conditions or between the clauses in the Particular Conditions. It is essential that all these drafting tasks, and the entire preparation of the tender documents, are entrusted to personnel with the relevant expertise, including the contractual, technical and procurement aspects. This publication concludes with example forms for the Letter of Tender, the Appendix to Tender (providing a check-list of the sub-clauses which refer to it), the Contract Agreement, and alternatives for the Dispute Adjudication Agreement. Contents of General Conditions General Provisions The Employer The Engineer The Contractor Nominated Subcontractors Staff and Labour Plant, Materials and Workmanship Commencement, Delays and Suspension Tests on Completion Employer’s Taking over Defects Liability Measurement and Evaluation Variations and Adjustments Contract Price and Payment Termianation by Employer Suspention and Termination by Contractor Risk and Responsibility Insurance Force Majeure Claims, Disputes and Arbitration Definitions 1. List of Sub-Clauses: 1.1.3.1 13.7 Base Date 基准日期 1.1.3.2 8.1 Commencement Date 开工日期 1.1.6.6 4.2 Performance Security 履约担保 1.1.4.7 14.3 Interim Payment Certificate 期中付款证书 1.1.3.3 8.2 Time for Completion (as extended under 8.4)
您可能关注的文档
- Brokk在有色工业的应用.ppt
- CadenceHDL与CIS原理图比较.doc
- catia曲面教材.ppt
- CATIA运动分析.ppt
- CCM工作原理知识.ppt
- ChineseSpacetechnology中国航天技术的发展.ppt
- CNA操作指南.ppt
- CognosFrameworkManager创建数据包参考手册.doc
- compcaseApplyingFinancialStatementAnalysis(财务报表分析台湾中兴大学).ppt
- ControlDesk基础培训.ppt
- 第十一章 电流和电路专题特训二 实物图与电路图的互画 教学设计 2024-2025学年鲁科版物理九年级上册.docx
- 人教版七年级上册信息技术6.3加工音频素材 教学设计.docx
- 5.1自然地理环境的整体性 说课教案 (1).docx
- 4.1 夯实法治基础 教学设计-2023-2024学年统编版九年级道德与法治上册.docx
- 3.1 光的色彩 颜色 电子教案 2023-2024学年苏科版为了八年级上学期.docx
- 小学体育与健康 四年级下册健康教育 教案.docx
- 2024-2025学年初中数学九年级下册北京课改版(2024)教学设计合集.docx
- 2024-2025学年初中科学七年级下册浙教版(2024)教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)六年级下册浙摄影版(2013)教学设计合集.docx
- 2024-2025学年小学美术二年级下册人美版(常锐伦、欧京海)教学设计合集.docx
文档评论(0)