毕业设计(论文)-8000td磁铁矿选矿厂设计.docVIP

毕业设计(论文)-8000td磁铁矿选矿厂设计.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
摘 要 按照毕业设计任务书的要求,进行了8000 t/d磁铁矿选矿厂设计,产品为铁精矿。 在包钢巴润矿业有限公司进行了为期三周毕业实习,收集相关设计资料的基础上。确定了各车间的工作制度,对设计工艺流程进行了选择和论证,确定了设计的工艺流程,即:破碎采用三段一闭路流程,磨矿采用两段全闭路流程,并采用阶段磁选,精矿用一段脱水。 对设计工艺流程进行了工艺指标计算,包括破碎、筛分、磨矿、磁选和脱水流程。对破碎、筛分、磨矿、分级、磁选及脱水设备进行了选择计算和方案比较,确定了工艺所需的工艺设备。 进行了厂房总体布置,并进行了厂房内的设备配置。根据选厂房的地形条件,沿山坡地布置,其中,粗碎、中碎、细碎、筛分厂房分开布置,磨矿和磁选共厂房配置。过滤机与精矿仓配置在厂房内。完成了粗碎、中碎、细碎、筛分、磨磁、脱水车间平断面图、数质量及矿浆流程图和设备联系图共9张。 关键词:选矿厂设计;磁铁矿;磁选 8000 t/d Magnetite Concentrator Design Abstract According to the request of the intruction of plant design for undergraduated, the design of 8,000 t/d magnetite concentrator, and the product is iron ore. On the basis of practice in Barun Mining Co.,Baotou Iron and Steel Group for three weeks, and the collection of data. The work institutions of each workshop were determined, and the technological process was also chosed and reasoned .The process of crushing is three sections with one close circuit, the grinding process is two sections with closed circuit, grinding stage by stage another election process, and a process with one section dewatering circiut which filtion was adopted. Technological parameters of crushing, screening, grinding, magnetic and dewatering were computed, respectively. Then the technological parameters of equipments were computed and the schemes of equipments were compared and the optimal equipments were determined. The general arrangement of concentrator plant and the allocation of equipments in diferent workshop were presented. According to the topography of plant site, plants were arranged along the slope of mountain. The workshops of coarse crushing, middle crushing , fine crushing and screening were aloted independent. The workshops of grinding and magnetic were put togather. The filitering workshop and concentrate bins were aloted inside. 9 pieces drawing, such as the workshop of coarse crushing, middle crushing, fine crushing, screening, grinding, magnetic, dewatering and so on, were finished. Key words: concentrator design;magne

您可能关注的文档

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档