采矿工程毕业设计(论文)-伊泰集团李家梁煤矿400万t新井设计.doc

采矿工程毕业设计(论文)-伊泰集团李家梁煤矿400万t新井设计.doc

  1. 1、本文档共149页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。 一般部分为0万t新井设计共10章:1.矿区概述及井田地质特征2.井田境界和储量3.矿井工作制度设计生产能力服务年限4.井田开拓5.准备方式-巷道布置6.采煤方法7.井下运输8.矿井提升9.矿井通风与安全技术10.矿井技术经济指标。位于主采煤层号煤,倾角,m,煤层埋深浅,地质条件简单,煤层有自然发火倾向,发火期40~60d,煤层具有强爆炸危险性。井田工业储量为万t,可采储量万t矿井服务年限为a。 设计矿井采用斜硐单水平开拓,前期采用中央并列式通风,后期采用两翼对角式通风。一矿一面,采煤方法为厚煤层综采一次采全高全部垮落法。煤炭运输,辅助运输采用无轨胶轮车。 矿井年工作日为30 d,工作制度“三八”制(班生产,一班检修),每日班出煤。专题部分题目。已17-23130翻译部分 ABSTRACT This design includes of three parts: the general part, special subject part and translated part. The general part is a new design of Lijialiang mine. Lijialiang mine lies in south of Eerduosi in NeiMenggu province. The six is the main coal seam, and its dip angle is 1 degree. The thickness of the mine is about 5.50m in all. It is bituminous coal with low mine gas emission rate and coal spontaneous combustion tendency, and it’s a coal seam liable to dust explosion.The proved reserves of the minefield are 433.04 million tons. The recoverable reserves are 315.95 million tons. The designed productive capacity is 4 million tons percent year, and the service life of the mine is 60.80 years. The well farmland is a single level in an inclined and calm well to expand. The working system “three-eight” is used in the Lijialiang mine. It produced 330d/a. This design includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.development engineering of coalfield; 5.The layout of panels; 6. The method used in coal mining; 7. Transportation of the underground; 8.The lifting of the mine; 9. The ventilation and the safety operation of the mine; 10.The basic economic and technical norms. The monographic study is the reinforcing plan、construction technology of three-soft surrounding rock.Designing the reinforcing plan、construction technology of three-soft surrounding rock and other improve measures. Translation part of main contentses is Deformation Dependent Permeability of Coal for Coalbed Methane (CBM) Recovery and CO2

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档