LCLS Week4-8 April, 2005Steve Lewis.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
LCLS Week4-8 April, 2005Steve Lewis.ppt

LCLS Week 4-8 April, 2005 Steve Lewis Layout Major Effort Areas Getting an accurate count of all devices Naming devices (and extending SLC convention) Aligning XTOD controls devices with LCLS global standards Reviewing cost+schedule Installing EPICS at LLNL Counting Devices Layout and instrument list has changed since original design Original design was not “EPICS-aware” Need block diagram or even one-line diagram to accurately define PLC, IOC and other controls-specific components LCLS-wide standards are (just) now being set All of above are basis for accurate cost+schedule Naming Devices Will conform to (and extend) SLC conventions Especially for “SLC-aware” devices Allows uniform notation on spread-sheets, one-line diagrams, as well as EPICS configuration Implicitly forces accurate counting LCLS Global Standards Safety must be engineered in Commerical products are one way to ensure this (UL, CE, …) Initial Q/A will take place at LLNL for many items LCLS Global Standards… Motor/Encoder chains: OMS58 in VME+transition card+power “brick”: 3 vendors; extra box+cables; great reuse of EPICS practice; parts long-lived Newport XPS single-box: turnkey; TCP/IP field-bus; new driver (and motor record?); rapid evolution of product likely Other? LCLS Global Standards… Vacuum/Gas: Controllers Architecture “Smart” controllers + inter-controller wiring + serial to EPICS Wiring complexity; less global integrity “Dumb” controllers+PLC+ Ethernet/IP to EPICS Global integrity; simple wiring ControlLogix vs. FlexLogic Trade-offs in cost, need for wire-centers, availability of EPICS driver LCLS Global Standards… Choices for Gauges MKS-937A w/317-CEP and 422-CCG 15msec response option Other? Choices for Ion Pumps Dual; Quad; ? MPS-2 SafeCONN Kaiser StarCell Other? Reviewing Cost+Schedule Accurate device count supports: I/O hardware and cabling costs Approx $200K to be added for master PLCs Configuring+Commissioning Effort Approx 1500 hours to be added for Tunnel Fixed costs

文档评论(0)

gsgtshb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档