- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈工程项目的投资控制
Introduction to the project investment control
摘 要:工程项目的投资控制,是基本建设的重要调控手段,关系着国家经济和整个行业的健康发展,一直是一个热门话题。本文从基本建设的不同阶段,分别就工程投资的三个基本环节进行了论述,希望能对工程建设的投资者的全过程管理起到借鉴作用。
Pick to: the investment control of the project, is one of the important control of capital construction, the relationship between the healthy development of national economy and the industry, has always been a hot topic. This article from the basic construction at different stages, respectively is discussed are the three basic links of project investment, hoping to investors in engineering construction to be used for reference in the whole process of management.
关键词: 工程 , 投资 , 经济
Keywords: engineering, investment, economy
工程项目的投资反映的是建设行业建筑产品的总造价。工程投资的控制应贯穿于工程建设的全过程,但长期以来,国内许多投资者或者业主普遍把工程项目投资控制的重心放在工程建设的实施阶段,即放在施工图预算及结算的审查上。这已经成了工程建设者的一个定式思维,虽然能对控制工程造价、节约投资起到一定作用,但是在工程的实施阶段加大力度,采取各种措施降低造价的做法,不能达到有效控制项目投资的目标,有事倍功半的效应。因为在工程的实施阶段,各种调控措施只能影响到整个造价的5%-15%,已经不能从根本上改变投资的控制效果。创新思路,拓展控制范畴,以有限的投资获得最佳经济效益,依然成为当今建筑行业的新目标。
Project investment reflect the building construction industry products total cost. Engineering investment control should be throughout the whole process of engineering construction, but for a long time, the domestic many investors or owners generally put the focus of project investment control in the implementation of the project construction phase, namely on the construction drawing budget and settlement of the review. This has become a project builder a pattern of thinking, while to control the engineering cost, saving investment, can play a role, but in project implementation stage, to take various measures to reduce cost, can not achieve effective control of project investment, has the effect of the wasted effort. Because in the project implementation stage, all kinds of measures can only affect the entire cost of 5% to 15%, has not fundamentally change the investment control effect. Innovative ideas, expand control category, with limited investment to obtain the best economic benefit
您可能关注的文档
- 江苏大学开展深入学习实践科学发展观活动【荐】.doc
- 江苏技术师范学院本科生毕业论文_格式要求_【荐】.doc
- 江苏江淮动力股份有限公司关于召开2009年度股东大会的通知【荐】.pdf
- 江苏泰兴洋思中学参观考察学习报告【荐】.doc
- 江苏洋思中学 改革启示【荐】.ppt
- 江苏理工学院 2014 届毕业设计(论文)任务书【荐】.doc
- 江苏省2013年会计从业考试会计基础知识点财产物资的收发、增减和使用002江苏财会【荐】.ppt
- 江苏省东海县房山高级中学高二3班家长会【荐】.ppt
- 江苏省无锡市2015届高三上学期期中考试历史试卷【荐】.doc
- 江苏省泰兴市洋思中学2011-2012学年初三第一学期第一次月月清语文试卷苏教版【荐】.doc
文档评论(0)