ESTIMATING EARTHWORK.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ESTIMATING EARTHWORK.ppt

Prof Awad S. Hanna Prof Awad S. Hanna ESTIMATING EARTHWORK Estimating Earthwork Earthwork includes: 1. Excavation 2. Grading: Moving earth to change elevation 3. Temporary shoring 4. Back fill or fill: Adding earth to raise grade 5. Compaction: Increasing density 6. Disposal Productivity Factors A. Job conditions Material type Water level and moisture content Job size Length of haul Haul road condition (accessibility and load restrictions) Productivity Factors (cont.) B. Management conditions Equipment conditions and maintenance practices Skills of work force and management Planning, supervision and coordination of work. Job Efficiency Factors for Earthmoving Operations Units of Measure Cubic Yard (bank, loose, or compacted) Volume Bank: VB Bank cubic yards (BCY) Density B Lb /BCY Loose: Vl Loose cubic yards (LCY) Density L Lb/LCY Compacted: Vc Compacted cubic yards (CCY) Density C LB/CCY Swell: A soil increase in volume when it is excavated. Swell (%) = ( - 1) x 100 Load factor = Bank Volume = Loose volume x Load factor Shrinkage: A soil decreases in volume when it is compacted Shrinkage (%) = (1 - ) x 100 Shrinkage factor = 1 - Shrinkage Compacted volume = Bank volume x Shrinkage factor Approximate Material Characteristics Exact values will vary with grain size, moisture content, compaction, etc. Test to determine exact values for specific soils. Typical Soil Volume Conversion Factors Estimating Earth work for Trenches and Foundation Approximate Angle of Repose For Sloping Sides of Excavation Calculating Earthwork Quantities 1. End Area Method 2. Contour Line/ Grid Method 1. End Area Method Used in sites where length is much greater than width CALCULATING EARTHWORK QUANTITIES 1. End Area Method a. Take cross-sections at regular intervals, typically, 100’ intervals. b. Calculate the cross-section end areas c. The volume of earthwork between sections is obtained by taking the average of the end areas at each station in square feet mult

文档评论(0)

gshshxx + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档