- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ESTIMATING EARTHWORK.ppt
Prof Awad S. Hanna Prof Awad S. Hanna ESTIMATING EARTHWORK Estimating Earthwork Earthwork includes: 1. Excavation 2. Grading: Moving earth to change elevation 3. Temporary shoring 4. Back fill or fill: Adding earth to raise grade 5. Compaction: Increasing density 6. Disposal Productivity Factors A. Job conditions Material type Water level and moisture content Job size Length of haul Haul road condition (accessibility and load restrictions) Productivity Factors (cont.) B. Management conditions Equipment conditions and maintenance practices Skills of work force and management Planning, supervision and coordination of work. Job Efficiency Factors for Earthmoving Operations Units of Measure Cubic Yard (bank, loose, or compacted) Volume Bank: VB Bank cubic yards (BCY) Density B Lb /BCY Loose: Vl Loose cubic yards (LCY) Density L Lb/LCY Compacted: Vc Compacted cubic yards (CCY) Density C LB/CCY Swell: A soil increase in volume when it is excavated. Swell (%) = ( - 1) x 100 Load factor = Bank Volume = Loose volume x Load factor Shrinkage: A soil decreases in volume when it is compacted Shrinkage (%) = (1 - ) x 100 Shrinkage factor = 1 - Shrinkage Compacted volume = Bank volume x Shrinkage factor Approximate Material Characteristics Exact values will vary with grain size, moisture content, compaction, etc. Test to determine exact values for specific soils. Typical Soil Volume Conversion Factors Estimating Earth work for Trenches and Foundation Approximate Angle of Repose For Sloping Sides of Excavation Calculating Earthwork Quantities 1. End Area Method 2. Contour Line/ Grid Method 1. End Area Method Used in sites where length is much greater than width CALCULATING EARTHWORK QUANTITIES 1. End Area Method a. Take cross-sections at regular intervals, typically, 100’ intervals. b. Calculate the cross-section end areas c. The volume of earthwork between sections is obtained by taking the average of the end areas at each station in square feet mult
您可能关注的文档
最近下载
- (湘科2024版)科学一年级上册全册教学案.pdf VIP
- 环氧磨石地坪施工方案.doc VIP
- 2024-2025学年统编版(2024)小学道德与法治五年级下册(全册)教学设计及反思(附目录P110完整版).docx VIP
- 四川省2024年普通高等学校高职教育单独招生文化考试(普高类)语文真题及答案解析(真题解析版).docx VIP
- 混龄游戏活动对小班幼儿社会性发展的影响研究.pdf VIP
- 2025道路沥青红外光谱法快速识别技术规程.docx VIP
- 输变电工程标准工艺(变电工程电气分册)2024版.pptx VIP
- 《VFD-E_使用手册》.pdf VIP
- 小学五年级数学课题研究计划.docx VIP
- 2025《基于S7-1200控制器的S电站渗漏排水系统电气控制设计》14000字.docx VIP
文档评论(0)