- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010-03-03-QSA_SEMCO_ENG.xls
SQCI
CheckSheet
Rank
Summary
Profile
Title
√Check if improvement countermeasure is continuously managed (Check if the next Lot is improved) 持续改进对策 (检查下一批次是否改善)
√Check if re-inspection is requested for the rejected Lot after performing re-inspection at process 拒收批次执行重检程序
12.4 Management status of Outgoing Inspection result 出货检验结果管理
√Check if the actual result of outgoing inspection is collected and analyzed periodically (weekly / monthly) 出货检验结果的定期收集/分析(按周/按月)
√Check if systematic improvement activity such as improving worst process defect is being deployed 系统的改进活动,如最差工艺缺陷进行改善
13.1 Status of Change Point Notification (工程和工艺)变更点通知管理
√Check if Change Point is notified without missing, and its reply is being managed 变更点通知、无遗漏,答复 受管理
LLG:这是从网络上下载的三星SQCI认证证书
√Check if Change pointes is registered in SQCI System and its record is managed 变更点在SQCI体系注册,记录管理
√Check if reply, application on production, delivery schedule is managed when notifying Change Point (工程和工艺)变更通知 有答复、应用产品、发送时间 等管控
13.3 Management status of 2nd Vendor Change Point 2次供方变更点管理
√Check if change notification and control process between the 2nd Vendor is constructed 2次供方变更时应有变更通知控制程序
√Check if the 2nd Vendor change point notification is reviewed and replyed within period 2次供方变更点通知在一定期限内 检查 和答复
13.2 Management Status of change initial product 原始产品变更状态控制
√Check if The Initial Product of Change Point is marked on incoming inspection result sheet when inspection initial product (change/new) 原始产品(变更品/新品)进料检验时应在检验结果单上标注“原始产品变更点”
√Check if The Initial Product of Change Point Label is attached when deliverying the initial product (change/new) 原始产品(变更品/新品)发料时应有“原始产品变更点”标签
√Check if incoming inspection is performed on the initial product of the 2nd Vendor and its result is being recorded 二次供方的原始产品的进料检验结果记录保持
14.1 Status of Temporary countermeasure for customers complaints 客户抱怨临时对策
√Check if the customers complaint is notified to the related department
您可能关注的文档
最近下载
- 2024年秋一年级上册1秋天 公开课一等奖创新教学设计.docx VIP
- 【苏教版信息科技】七年级上册第二单元第3课《资源的管理与贡献》课件.ppt VIP
- 22G101 三维彩色立体图集.docx VIP
- (正式版)DB15∕T 2430-2021 《公路岩沥青微表处技术规范》.pdf VIP
- 《小学教师专业发展》期末复习题及参考答案.docx
- 第二章合成氨.pdf VIP
- (2025年)职业卫生评价检测试题及答案.docx VIP
- 2025年东湖高新历年面试题目及答案.doc VIP
- 16天记忆7000考研单词(完整版-带注释).pdf VIP
- 《从隋唐盛世到五代十国》PPT优秀教学课件.pptx VIP
原创力文档


文档评论(0)