- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
10 FMEA
Capture.Capture
Capture.Capture
GoA1
GoA1
POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS
Part Certification
01 PSW!H6
01 PSW!F25
Page
FMEA Number
Part Number
Prepared by
Telephone #
Model Year(s) / Vehicle(s)
Key Date
Original FMEA Date
FMEA Revision Date
Core Team
Design Item or Process Function Requirements
Potential Failure Mode
Potential Effect(s) of Failure
Sev
Class
Potential Cause(s) / Mechanism(s) of Failure
Occ
Current Design or ProcessControls
Det
RPN
Recommended Actions
Responsibility Target Completion Date
Actions Taken
.
Design or Process Responsibility
6
2
No
5
塑性变形
过载
静载荷过大
冲击载荷过大
内外圈不正
润滑不良
速度太高
不适当的装配
内外圈配合柱面松动
断裂
配合太紧
装配面不均匀
轴承座畸变
旋转爬行或微动磨损
轴承内有湿气或酸液
有电流连续或间断通过
润滑剂太多
内部游隙不当
轴承载工作中产生剧烈震动和噪音,以至轴承不能正常工作
轴承不能工作
锈蚀
电腐蚀
不正常升温
轴承
点蚀:内外圈的滚道及滚动体的表面出现许多点蚀坑
轴承:支承轴及轴上的零件,并与机座作相对旋转,使转动副之间的摩擦尽量降低,以获得较高传动效率
增加轴承座的刚性:轴承座要有足够的厚度,悬臂要小,采用加强筋,采用钢制或铸铁衬套。
内圈与轴径配合过紧
外圈与轴座配合过紧
磨损
轴承在密封不可靠,轴承内部有研磨物
润滑剂不清洁
装配环境尘大
影响轴承寿命,引起剧烈的振动和噪声
磨粒磨损
粘着磨损
of
HDM Filename: /
FMEA
28/4/2004
24.00
24.00
20.00
24.00
24.00
24.00
24.00
24.00
System
Subsystem
Component
Design FMEA
Process FMEA
Technique which identifies and ranks the PFM of a design or manufacturing process in order to prioritize actions
Enter the FMEA ducument number ,wich may be used for tracking, or a descriptive family product name.
Enter the name and number of the system, subsystem or component for wich the process is being analyzed
Enter the OEM, departament and group,also include the supplier name if known
Enter the name, and company of the engineer responsible for preparing the PFMEA
Enter the Telephone number of the engineer responsible for preparing the PFMEA
Enter the intended model year and vehicle that will utilize or be affected by the design/process being analyzed
Enter the initial FMEA due date,wich should not exceed the scheduled start of production date.
Enter the date the original PFMEA was compiled.
En
您可能关注的文档
- (民间游戏).ppt
- 《21世纪课堂评价》结业作业1.doc
- 《大学英语2》作业2015.7-8交.doc
- 《雷雨前》.ppt
- 【2015年8月15日】梦幻西游老朋友序列号.doc
- 【高考复习方案】2015届高三物理一轮复习作业手册(全国通用)精讲:第12讲 功 功率.doc
- 【软实力管理】沟通管理技巧培训.ppt
- 【住宅投资景气指数】2015年上半年全国重点城市住宅景气指数.pdf
- 0 T30主体结构验收自评报告.doc
- 1.4.2.2有理数的除法-数学-新课标-人教版七年级-第一章-第9节-第2课时.ppt
- GF-IT-03 ATT1. SAP系统用户与权限申请表 SAP New User Application Form-141021-V0.0.xls
- GF-IT-08 IT设备报废流程-150109-V0.0.pdf
- GHG盘查技术与报告案例.pdf
- HDJ交流窜入直流监测装置说明书.doc
- MF58 R25=2k B值3380NTC热敏电阻RT关系曲线表.doc
- PE-SOP10刀模管理流程1.0-20080625.pdf
- PE袋系列(08页).xls
- PowerPoint的高级应用技巧培训.ppt
- R25=0.5K B25-50=3300NTC热敏电阻RT技术参数表.doc
- R25=2.1k±1% B25-50=3850NTC热敏电阻温度阻值RT表.doc
文档评论(0)