网站大量收购独家精品文档,联系QQ:2885784924

0_【精品】浅析建筑工程雨季施工方案.doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
0_【精品】浅析建筑工程雨季施工方案.doc

浅析建目 录 …………………………………………………………………………… 1 英文摘要 ………………………………………………………………………………………………………………………………………………………… 2 1.1 雨季施工对工程的影响 ………………………………………………………2 1.2雨季施工的特殊性 …………………………………………………… 3 1.3.雨季施工的基本原则和要求 ………………………………………………4 1.4.雨季施工管理目标 ………………………………………………………4 2.雨季施工措施 2.1.近年来雨季施工中的主要问题 ……………………………………………5 2.2.雨季施工前准备工作 ………………………………………………………6 2.3.保证质量技术措施 …………………………………………………………9 2.4.雨季施工的技术要点措施 …………………………………………………10 3.雨季施工安全 3.1.雨季施工的安全措施 ………………………………………………………11 3.2.雨季施工其它注意事项……………………………………………………13 4.临建工程及其他 …………………………………………………………14 5.结论 …………………………………………………………………………15 参考文献…………………………………………………………………………16 摘  要:Abstract:Our country vast in territory, the regional precipitations and the time distribution is extremely imbalanced. The south area precipitation is high, the time is rainy season long. The northern area precipitation is small, rainy season relatively concentrates in 6~ in August. No matter the north and south regarding are in this times the architectural engineering, the rainproof construction technique measure appears especially important. As a result of according to the architectural engineering progress request, Chang Xu constructs in the rainy season. Especially along with high-rise constructions gradual increase, rainy season constructs the measure is noticeable. The possible arrangement rainy season constructs, is guaranteed that the project quality and the production safety, raise the economic efficiency the important guarantee. Therefore, we should strengthen to this technical research. This article particularity which rainy season constructs through the analysis, constructs the basic principle in view of the rainy season and the request, proposes the technical point, and carries on the discussion to the security measure. Key words:Rainy season constructs Technical point Foundation construction Concretes Safe 1.概述 夏季施工面临雨多、风大、高温等不利环境因素的影响,并能直接危及生产安全,给企业带来无法估量的损失。因此科学合理组织施工.采取安全技术措施,积极应对雨期施工面临的各种危险状况,对提高抗风险能力、保障企业生产

文档评论(0)

qspd + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档