- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
索穹顶结构整体提升张拉逆向模拟分析施工全过程研究,张拉整体结构,张拉整体,张拉整体式结构,索穹顶,索穹顶结构,ansys索穹顶的问题,张拉千斤顶,张拉设备,锚索张拉千斤顶
40 10 2010 10
*
1 1 2 1
张丽梅 , 梁小勇, 陈务军, 杜守军
( 1 , 050018; 2 , 200030)
[ ] ,
, 2 , 5 ,
, ,
, ,
,
[ ] ; ;
Simulation analysis of whole inverse lifting and stretching process for integral cable dome structures
1 1 2 1
Zhang Limei , Liang Xiaoyong , Chen Wujun , Du houjun
( 1 Architecture and Civil Engineering, Hebei University of cience and Technology, hijiazhuang 050018, China;
2 pace tructures Research Center, hanghai Jiaotong University, hanghai 200030, China)
Abstract:A simulation method of integral inverse lifting and stretching process for the cable dome was established based on
nonlinear finite element method. The integral inverse lifting process of the cable dome was realized through changing the length of
the positive constant force cables and the subsidiary cables. The cablestrutbeam model was used to simulate the cable dome, and
the positive constant force cables and the subsidiary cables, the passive cables, the mast, the hub were respectively simulatedwith
the twonode curved element, the fivenode isoparametric element, the strut element and the beam element. In the integral inverse
lifting process, the integral cable dome moved from the final equilibrium state to the hub reaching ground, and the temperature
action can simulate the variations of the cable length. All the structural members of the cable dome were assembled on the floor,
and this can prevent structural assemblage in the air and spare construction time. At the same time, the changes of the structural
topological relation can be avoided.
Keywords: cable dome; inverse simulation analysis; integral lifting