- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
APQP供应商质量工程师培训教材.ppt
Read Slide and explain that today is the Kick-Off meeting or Pre-Production meeting where all deliverables required for Supplier Program Review #1 will be reviewed The supplier should have received a letter from you prior to the Kick-Off meeting explaining what is required at this Kick-Off meeting STRESS that the main objective of today’s meeting is to make sure that the supplier understands all the requirements in GM’s common APQP process Make sure they understand how the updates to the requirements will be done The 4 Supplier Program Reviews are the minimum formal reviews that will take place Additional program meetings will most likely occur these could be engineering work teams or internal supplier team meetings Read Slide As this first Supplier Program Review continues each of the documents listed here will reviewed 13 11 Read Slide This review follows the same logic that program review 2 followed Basically, more detail will be required on any item that was reviewed at PR#2 Read Slide You may want to have the APQP Project Plan GM 1927-1 handy to put on the screen again and identify items with a 3 Read Slide Detail is spelled out on the slide Read Slide Understand that GP-11 or Pre-Prototype and Prototype requirements are NOT the responsibility of the SQE, BUT we need to be involved in making sure the engineer is clearly communicating what is required for these builds The requirements include what dimensional checks will be needed to be completed by the supplier, will parts need to be serialized? These requirements are the GM engineers responsibility Read Slide Level of detail explained on slide Read Slide Clearly explain supplier that this is a GM INTERNAL document and IS NOT SHARED IN DETAIL WITH THE SUPPLEIR WHEN IT IS COMPLETED NEVER PROVIDE A COPY TO THE SUPPLEIR OF A COMPLETED FORM Read Slide Items due for review are all the PPAP required documents Read Slide Read Slide Slide explains the requirements Read Slide The PFMEA Strategy is n
文档评论(0)