500kV同杆并架输电线路并联高抗谐振过电压分析及其应对策略.pdfVIP

  • 53
  • 0
  • 约1.14万字
  • 约 7页
  • 2018-03-27 发布于安徽
  • 举报

500kV同杆并架输电线路并联高抗谐振过电压分析及其应对策略.pdf

中国电机工程学会第十三届青年学术会议论文集 500kV 同杆并架输电线路并联高抗谐振过电压 分析及应对策略 王春明,徐玮,熊华强,汪旸 (华中电力调控分中心湖北省 武汉市 430074 ) Analysis and Coping Strategies of Resonance Overvoltage Produced by Shunted Reactor on 500kV Parallel Lines on Same Tower WANG Chunming, XU Wei, XIONG Huaqiang, WANG Yang Central China Electric Power Dispatching and Controlling Center, Wuhan City Hubei Province, 430074 Abstract: In this paper, we analyze the mechanism of 抗中性点小电抗的影响。以某双回输电线路规划设计过 resonance overvoltage of the 500kV parallel transmission 程为例,对该双回输电线路进行了仿真计算,计算结果 lines on same tower when one of the lines having a shunted 表明,该双回线路中一回线路由于参数匹配产生了严重 reactor, the characteristics resonant voltage and current of 的谐振过电压,中性点小电抗数值对两回线路通过线间 after excitation power source disappears and the influence 耦合激励产生串联谐振的抑制效果有限。本文还从稳态 of neutral point small reactor of shunted reactor. Taking a 电压、操作过电压、潜供电流、无功平衡等方面分析了 double-circuit transmission line during planning and design 线路并联高抗退出运行的影响。针对同杆并架输电线路 stage for instance, we establish the line model and execute 并联高抗谐振过电压问题,本文提出了规划设计阶段、 the simulation. The results show that serious resonance 投产调试阶段应对策略。 overvoltage occurs in the proposed example due to the 关键词:电力系统;同杆并架;并联高抗;谐振过电 parameters match. The inhibitory effect of neutral point 压 small reactor on series resonance generated by the coupling between two lines is limited. We also study the steady-state 1 引言 voltage, over-voltage, secondary arc current, reactive power 电力系统中发生故障或操作时,电力系统某 balance when put the line into operation without shunted 些回路被开断或重新组合,电感、电容元件形成 reactor. Finally, for the same tower transmission line 的各种振荡回路,如果参数匹配,某一自由振荡 parallel high resistance to resonance over voltage problem, 频率等于外加强迫频率,将会产生周期性或准周 we put forward the coping strategies to the resonance 期性的谐振现象。谐振过电压表现为某一个或几 overvoltage produced by shunted reactor on 500kV parallel 个谐波电压幅值和电流幅值的急剧上升;持续时 lines on same tower during the planning a

文档评论(0)

1亿VIP精品文档

相关文档